Kansas transportation officials approved bids for state highway construction and maintenance projects following the Sept. 16, 2026, letting in Topeka. The listed work spans road resurfacing, sealing, bridge replacement, intersection improvements and pedestrian and bicycle paths. The largest listed September project is a $104,745,877.68 K-10 grading, bridge and surfacing project in Douglas County.
What the September bid announcement covers
The announcement lists approved bids by county and route, with work descriptions, project lengths where stated, contractors and bid amounts. A letting is the bid-opening event; the Sept. 16 date is distinct from the announcement’s Oct. 2, 2026, publication date.
Some entries may bundle multiple projects based on proximity and type of work. The figures below are individual listed bid amounts, not a published statewide total. Amounts also should not be read as direct comparisons of project scale: sealing, bridge work, paths and multi-mile resurfacing involve different scopes.
September 2026 approved projects by district
District One — Northeast
| County or area | Route and work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Douglas County | K-10, I-70/K-10 junction south to 0.66 mile north of the K-10/U.S. 40 junction; grading, bridge and surfacing | 1.2 miles | Bettis Asphalt & Construction Inc., Topeka | $104,745,877.68 |
| Riley County | U.S. 24, west U.S. 77/U.S. 24 junction east to the east junction; sealing | 4.1 miles | Vance Brothers LLC, Kansas City, Missouri | $326,319.20 |
| Wabaunsee County | K-31, K-99/K-31 junction east to the Wabaunsee/Osage county line; sealing | 10.0 miles | Vance Brothers LLC | $623,220.40 |
| Leavenworth and Atchison counties | U.S. 73, from 0.2 mile north of Millwood Road to the Leavenworth/Atchison county line, then to Atchison’s south city limits; sealing | 12.2 miles | Vance Brothers LLC | $741,470.50 |
District Two — North Central
| County | Route and work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Jewell | K-14, east U.S. 36/K-14 junction north to Kansas/Nebraska state line; ultra-thin bonded asphalt surfacing | 15.2 miles | Hall Brothers Inc., Marysville | $1,558,711.86 |
| Jewell | U.S. 36, 4.63 miles east of east U.S. 36/K-14 junction to Jewell/Republic county line; ultra-thin bonded asphalt surfacing | 5.6 miles | Hall Brothers Inc. | $754,572.49 |
| Republic | U.S. 81, Cloud/Republic county line north 11.023 miles; milling and overlay | 11.0 miles | Hall Brothers Inc. | $3,096,470.74 |
| Republic | K-266, U.S. 36/K-266 junction north to route end; milling and overlay | 7.5 miles | Hall Brothers Inc. | $1,649,386.10 |
| Washington | U.S. 36, Washington’s east city limits east to Little Blue River Bridge; sealing | 8.9 miles | APAC-Kansas Inc. Shears Division, Hutchinson | $500,961.90 |
District Three — Northwest
The Northwest District list contains eight projects in Cheyenne, Decatur, Rawlins and Sheridan counties. Most are milling and overlay work.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →#1 Best Overall
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
| County | Route and work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Cheyenne | U.S. 36, Colorado/Kansas state line east to Road 11; milling and overlay | 10.2 miles | Bettis Asphalt & Construction Inc. | $2,260,501.26 |
| Decatur | U.S. 83, north end of Portland Cement Concrete Pavement north of U.S. 36 to Kansas/Nebraska state line; milling and overlay | 12.4 miles | Venture Corporation, Great Bend | $6,595,712.16 |
| Decatur | U.S. 83 in Oberlin, PCCP south of West Sappa Street north to U.S. 36/U.S. 83 junction; milling and overlay | 1.0 mile | Venture Corporation | $409,388.70 |
| Decatur | U.S. 36, Decatur/Rawlins county line east to U.S. 36/U.S. 83 junction; milling and overlay | 11.0 miles | Venture Corporation | $2,614,165.03 |
| Rawlins | K-117, U.S. 36/K-117 junction north to Kansas/Nebraska state line; milling and overlay | 12.0 miles | Venture Corporation | $2,332,957.20 |
| Rawlins | U.S. 36, 0.3 mile east of U.S. 36/K-25 junction east to Decatur/Rawlins county line; milling and overlay | 16.2 miles | Venture Corporation | $4,345,620.80 |
| Sheridan | K-23, Walnut Avenue north to 0.089 mile north of U.S. 24/K-23 junction; milling and overlay | 0.6 mile | Bettis Asphalt & Construction Inc. | $227,167.82 |
| Sheridan | U.S. 83, Thomas/Sheridan county line north to 0.04 mile south of U.S. 83/K-23 junction; milling and overlay | 10.6 miles | Bettis Asphalt & Construction Inc. | $2,484,391.13 |
District Five — South Central
| County | Route and work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Butler | K-196, Harvey/Butler county line east to K-254/K-196 junction; milling and overlay | 18.9 miles | APAC-Kansas Inc. Shears Division | $4,125,662.01 |
| Kiowa | Greensburg pedestrian and bicycle paths on portions of West Florida Avenue, South Main Street, South Walnut Street, West Garfield Avenue, South Sycamore Street, West Wisconsin Avenue and West Iowa Avenue | 1.0 mile | PSE Contractors LLC, Wichita | $716,444.00 |
| Sedgwick | Intersection improvement at 85th Street and Broadway Street in Park City | 0.2 mile | Kansas Concrete LLC, Nickerson | $1,437,896.28 |
| Sumner | U.S. 81, U.S. 177/U.S. 81 junction north to 0.46 mile north of East 60th Street South; milling and overlay | 10.4 miles | Pearson Construction LLC, Wichita | $1,974,543.99 |
District Six — Southwest
| County or area | Route and work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Grant | K-25, north city limits of Ulysses north to Grant/Kearny county line; recycle and overlay | 9.8 miles | Dustrol Inc., Towanda | $1,451,470.42 |
| Hamilton | K-27, Stanton/Hamilton county line north to Syracuse’s south city limits; milling and overlay | 16.2 miles | J&R Constructors Group LLC, Liberal | $3,574,119.21 |
| Kearny | K-25, Grant/Kearny county line north to Lakin’s south city limits; recycle and overlay | 15.6 miles | Dustrol Inc. | $2,208,771.28 |
| Morton | K-27, west K-51/K-27 junction northeast to east junction; milling and overlay | 14.4 miles | J&R Constructors Group LLC | $5,137,148.13 |
| Morton | K-51, Colorado/Kansas state line east to K-51/K-27 junction; milling and overlay | 7.8 miles | J&R Constructors Group LLC | $1,162,644.86 |
| Ness | Bridge over Bazine Dry Creek, 7.0 miles east and 2.7 miles north of Ness City; bridge replacement | 0.3 mile | L & M Contractors Inc., Great Bend | $354,846.50 |
| Stanton | K-27, south U.S. 160/K-27 junction north to Stanton/Hamilton county line; milling and overlay | 12.0 miles | J&R Constructors Group LLC | $2,723,617.57 |
| Scott and Lane | K-4, U.S. 83/K-4 junction east to Scott/Lane county line, then to east K-23/K-4 junction; sealing | 23.8 miles | Heft & Sons LLC, Greensburg | $1,249,111.24 |
| Seward and Haskell | K-190, Haskell/Seward county line southeast to U.S. 83/K-190 junction in Seward County, then north to U.S. 56/K-190 junction in Haskell County; recycle and overlay | 10.8 miles | Dustrol Inc. | $1,499,067.21 |
| Meade and Gray | K-98 in Meade County to Fowler; K-23 from U.S. 160 north to Meade/Gray county line, then to K-23/U.S. 56 junction; sealing | 32.7 miles | Heft & Sons LLC | $1,274,564.20 |
Projects separately approved from the Aug. 19 letting
The announcement also includes a separate group of projects approved from the Aug. 19 letting. These are not part of the Sept. 16 letting list.
| County and location | Work | Length | Contractor | Bid amount |
|---|---|---|---|---|
| Trego County, WaKeeney | Landscaping and beautification on Main Street and Russell Avenue | 0.4 mile | APAC-Kansas Inc. Shears Division | $1,589,669.80 |
| Cherokee County, Baxter Springs | U.S. 69A pavement restoration from 23rd Street to 20th Street; grading and surfacing | 0.2 mile | Heck & Wicker Inc. | $1,937,071.70 |
| Labette County, Altamont | Pedestrian and bicycle paths on Ness Road, 5th Street and Lincoln Avenue, including a U.S. 160 segment | 1.0 mile | J Graham Construction Inc. | $585,378.50 |
| Miami County | Bridge over Middle Creek, 1.5 miles south and 1.8 miles west of New Lancaster; bridge replacement | 0.1 mile | Dondlinger & Sons Construction Co. Inc. | $978,549.40 |
| Harvey County, Sedgwick | Pedestrian and bicycle path on west side of North Commercial Avenue from 5th to 6th Street | 0.1 mile | Prado Construction LLC | $879,785.85 |
| Kiowa County | Bridge over East Fork of Rattlesnake Creek near Greensburg; bridge replacement | 0.1 mile | Reece Construction Company Inc. & Subs | $659,102.58 |
| Finney County | Bridge over Pawnee River on North Ravana Road; bridge replacement | not stated in the announcement | Reece Construction Company Inc. & Subs | $478,851.03 |
What the bid list does not tell drivers
The approval announcement provides bid and project information, but it does not establish construction start dates, work schedules, detours or traffic impacts. Drivers should look for separate project updates from transportation officials before planning around a specific work zone.
Quick Recap
Best Value
- Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
- 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
- Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
- Hard hat clip- attaches for easy access
- Quick dry time with reduced smearing and marking
Rank #4
- Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
- Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
- Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
- Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
- Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
Rank #3
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Rank #2
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Compact and Lightweight: Both tools are designed to fit into difficult to reach spaces. The 1/4" impact driver has a length of 5.55 in. and weighs just 2.8 lbs, while the 1/2" drill/driver measures only 7.5 in. and weighs 3.6 lbs
- Both the DEWALT impact driver and electric drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
- Power drill cordless with 1/2" single sleeve ratcheting chuck provides tight bit gripping strength, making bit changes faster and more secure
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.