PC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchSome links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Foundry Park, a roughly $3 billion mixed-use neighborhood on Chicago’s North Branch, broke ground on October 21, 2026. JDL Development and Kayne Anderson Real Estate are redeveloping 31 acres of the former A. Finkl & Sons/Finkl Steel property, part of the northern Lincoln Yards site. Current city materials call for up to 3,737 mixed-income residences, about 970,000 square feet of office, retail and hotel space, public parks and riverfront improvements. The first phase includes more than 725 homes, retail, green space and underground parking. A planned connection to The 606/Bloomingdale Trail is included, although its Chicago River crossing still requires engineering and later construction.
What is Foundry Park in Chicago?
Foundry Park is the residentially focused successor to the northern portion of the stalled Lincoln Yards concept. The neighborhood will occupy about 31 acres along the North Branch of the Chicago River near West Cortland and North Kingsbury streets, including the former Finkl Steel industrial property. JDL Development and Kayne Anderson Real Estate are the development partners. Hartshorne Plunkard Architecture designed the approved plan, with landscape work by Nudge Design.
As an Amazon Associate I earn from qualifying purchases.
The project replaces a much larger, office-heavy vision proposed by Sterling Bay before the pandemic. Foundry Park is planned as a mixed-use district combining housing, employment space, hospitality, parks and public river access rather than a primarily commercial campus.
When did Foundry Park break ground?
Chicago officials and the development team held the groundbreaking on Wednesday, October 21, 2026, near West Cortland and North Kingsbury streets. The ceremony marked the start of construction on the northern Lincoln Yards/Finkl Steel area after years of planning changes and the collapse of the earlier Lincoln Yards proposal.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
JDL CEO Jim Letchinger described financing as essential to moving from planning to construction: “Capital is critical. We went through planning knowing that as soon as we get this done, we’re building.” The full neighborhood will be delivered over multiple years, and later construction timing will depend on demand and financing.
What is being built at the former Lincoln Yards site?
The latest city description sets out the following program:
| Component | Current description |
|---|---|
| Residences | Up to 3,737 mixed-income homes; the October reporting describes a 20% affordable-housing commitment |
| Commercial and hotel space | About 970,000 square feet of office, retail and hotel uses |
| First hotel | A planned 183-room hotel in the initial buildout |
| Public realm | About eight acres of public green space, with parks, plazas, playgrounds, a dog park and riverwalk improvements |
| Building types | Townhomes, single-family homes, residential buildings and mixed-use towers |
Earlier approved-plan coverage described about 8.5 acres of open space, so the acreage depends on which plan version is being referenced. That earlier snapshot also included a 38-story, 520-foot mixed-use building and a 35-story residential tower. The later city and groundbreaking materials use the 31-acre site and up-to-3,737-residence figures as the current description.
What is included in the first phase?
Phase one is concentrated around Southport Avenue, Cortland Street and Kingsbury Street. The October project description says it contains more than 725 residential units, retail, publicly accessible green space and underground parking.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
An earlier approval account characterized the first phase as an approximately $800 million buildout of four buildings:
- An 11-story hotel building
- A 13-story residential building
- An eight-story residential building
- A 38-story mixed-use tower
- About 300 underground parking spaces
Those earlier building details are an approved-plan snapshot; individual buildings, tenure and sequencing can change as the multiyear development advances. The residential program may shift between rental and for-sale homes in response to market conditions.
How does Foundry Park differ from the original Lincoln Yards plan?
Foundry Park is smaller in scope and more housing-led than the abandoned Lincoln Yards concept. The earlier proposal emphasized a much larger office district, while the current plan puts thousands of residences, neighborhood retail, a hotel and public open space at the center.
| Issue | Foundry Park | Earlier Lincoln Yards concept |
|---|---|---|
| Primary emphasis | Mixed-use neighborhood with a large residential component | Larger office-oriented district |
| Site figure | 31 acres in current materials | 28 acres in earlier approved-plan coverage |
| Housing figure | Up to 3,737 mixed-income residences | Earlier coverage cited 3,690 apartments/condos plus houses and townhomes |
| Public space | About eight acres in current materials | About 8.5 acres in an earlier plan version |
| Connectivity | Riverwalk improvements and a planned 606 connection | Not established in the current project description |
The differing acreage and housing totals reflect plan stages, not necessarily a contradiction. Current city and groundbreaking documents should be used for the project’s present description, while older numbers identify what was approved at an earlier stage.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
How many homes and jobs will Foundry Park create?
The city’s September 2026 release describes up to 3,737 mixed-income residences, and October reporting says 20% are planned as affordable. The first phase accounts for more than 725 units; the remaining homes would arrive in later phases.
Chicago Department of Planning and Development commissioner Ciere Boatright projected about 2,500 jobs and eight acres of public green space. The job figure is an expected project benefit, not a count of positions already filled, and the final employment mix will depend on which office, retail and hotel tenants occupy the completed buildings.
Recommended Free Tools
How much public money is going into Foundry Park?
Chicago City Council approved $201.6 million in tax-increment financing (TIF) support for roads, utilities and publicly accessible parks. The city says reimbursements are made as infrastructure components are completed, tying the public financing to delivered improvements rather than treating the entire amount as an unrestricted payment.
Boatright projected that, after the TIF district expires in 2043, the completed development could generate about $70 million a year in citywide property taxes. She also estimated a cumulative $1 billion contribution by 2056. Those are city projections based on the eventual completed project and future assessments, not guaranteed collections.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
Will Foundry Park extend The 606 over the Chicago River?
The plan includes a future extension of The 606/Bloomingdale Trail toward the river, alongside riverwalk and park improvements. Axios reported that about $21.5 million of the infrastructure package was proposed for the trail extension.
The river connection is not complete. Crossing the Chicago River requires additional engineering and construction, and the trail work is expected to be phased. No public opening date for the crossing has been established in the current project description, so residents should treat it as a planned component rather than an available route.
Do these 3 things before closing this tab:
1Scan for outdated or missing drivers - takes under a minute2Repair Windows errors before they cause bigger problems3Fix the driver behind crashes, sound loss and screen glitchesWhat remains uncertain about the project?
Groundbreaking establishes construction activity, but it does not fix every later detail. The following items can change during a multiyear buildout:
- The timing of buildings beyond phase one
- The balance of rental and for-sale residences
- The sequence of office, retail and hotel delivery
- The engineering, funding and construction schedule for the river crossing and 606 connection
- Final tenant, hotel-operator and public-realm details
Market demand and financing are the main reasons the developers have retained flexibility for later phases. The current headline figures—31 acres, up to 3,737 residences and about 970,000 square feet of nonresidential space—are the best description of the project at groundbreaking, while earlier approval figures should be read as historical snapshots.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Frequently Asked Questions
Is Foundry Park the same project as Lincoln Yards?
No. Foundry Park occupies the northern portion of the former Lincoln Yards area but is a new, more residentially weighted plan after the earlier Lincoln Yards proposal stalled. The names should not be treated as interchangeable when tracking approvals or construction progress.
Will the affordable homes be delivered in the first phase?
The current materials state that 20% of the overall residential program is planned as affordable, but they do not assign every affordable unit to a specific building or phase. Detailed unit-by-unit delivery information has not been established in the project description.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Does the TIF package mean Chicago is paying the developer $201.6 million upfront?
No. The city says reimbursements occur as eligible roads, utilities and public-space infrastructure is completed. The approved amount is therefore tied to infrastructure delivery and the TIF financing process rather than an unconditional upfront transfer.
When can people use the new 606 river connection?
There is no confirmed opening date. The extension is planned and has a proposed funding allocation, but the river crossing still needs engineering and construction and is expected to be delivered in phases.

