Commercial buildings save the most energy when owners first understand how the facility operates, then remove waste before buying new equipment. The ten measures below are practical options drawn from U.S. ENERGY STAR and Department of Energy guidance. They are not a universal ranking: climate, building type, occupancy, schedules, equipment condition and project budget determine which actions should come first.
Use the list as a decision framework. Begin with bills, operating schedules and an audit; capture low-cost operating improvements; reduce lighting and other loads; then commission controls and size heating and cooling upgrades around the lower demand.
As an Amazon Associate I earn from qualifying purchases.
What to do before choosing an energy project
Collect at least 12 months of electricity and fuel bills, floor area, occupancy patterns, equipment schedules and maintenance records. Note seasonal peaks, spaces that are empty after hours, comfort complaints and areas where equipment runs continuously. An energy audit or asset assessment can connect those observations to the building envelope, lighting, hot-water systems and HVAC equipment.
Do these 3 things before closing this tab:
1Clear out junk files and repair common Windows errors2Scan for outdated or missing drivers - takes under a minute3Repair Windows errors before they cause bigger problemsWalk the property at night and during unoccupied periods. ENERGY STAR recommends checking whether lights, air handlers, fans, pumps, computers and other loads are operating when nobody needs them. Record temperatures, set points and equipment status rather than relying on assumptions. Establish a baseline and a measurable goal so savings can be verified after changes.
#1 Best Overall
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
The U.S. Department of Energy identifies the envelope, lighting, hot water and HVAC as major building assets. Looking at those systems together prevents a common error: replacing a chiller or boiler before reducing the loads that determine its required capacity.
The 10 energy-saving measures
1. Benchmark performance and audit actual operation
Energy bills reveal consumption, demand peaks and seasonal patterns that equipment nameplates cannot. Normalize the data for floor area, weather and operating hours where possible, then compare similar months and identify unexplained changes. A professional audit can inspect combustion, refrigeration, controls, insulation, air leakage, lighting levels and schedules.
Include a nighttime walkthrough. A brightly lit, fully conditioned office at midnight is an immediate operating opportunity, while a warehouse with fans running on an empty weekend may indicate a schedule or control fault. Document findings by location, estimated effort, safety implications and interaction with other systems.
- Keep a baseline of monthly energy, peak demand, weather and occupied hours.
- List equipment that runs outside its intended schedule.
- Separate maintenance defects from capital projects.
- Set a review date and assign a person responsible for tracking results.
An audit does not guarantee a particular percentage reduction; it improves the odds that spending addresses the building’s actual causes of waste.
2. Fix schedules, sequencing and maintenance first
Operational changes are usually the quickest place to start. Review start-up and shutdown times, holiday calendars, lead-lag sequences, temperature deadbands and minimum ventilation settings. Coordinate air handlers, pumps, boilers, chillers and terminal units so equipment stages only as load requires.
Maintenance affects both energy and reliability. Replace or clean HVAC filters during peak heating and cooling periods, clean heat-transfer coils, inspect insulation, repair water or refrigerant leaks, lubricate components as specified and keep outdoor-air intakes and exhaust paths clear. Check that dampers, valves and actuators actually reach commanded positions.
Do not extend schedules simply to avoid a morning comfort complaint. Trend space temperatures and warm-up times, then adjust the start time to the latest point that reliably reaches occupied conditions. A controls technician may need to correct conflicting schedules in a building-management system.
Rank #2
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
3. Reduce unnecessary lighting load
Behavior and layout changes can cut lighting demand without changing every fixture. Turn lights off where daylight is sufficient, use task lighting instead of illuminating an entire room, remove unnecessary lamps where measured light levels remain appropriate and keep windows and skylights unobstructed. ENERGY STAR’s undated commercial checklist reports that switching off unneeded lights or using available daylight can reduce lighting expenses by 10 to 40 percent; that is a potential range, not a promise for every facility.
Coordinate lighting changes with safety, accessibility and work requirements. A storage aisle, examination room and open office have different illumination needs. Measure light levels before removing lamps, and label switches so occupants can make the intended choice.
4. Retrofit inefficient fixtures with LEDs
LED systems generally use much less electricity than incandescent sources and last longer, reducing relamping labor. ENERGY STAR states that LEDs use up to 90 percent less energy than incandescent lighting and can last 35 to 50 times longer. The comparison is specifically with incandescent lighting; savings will be smaller when replacing already-efficient fluorescent or high-intensity-discharge systems.
Survey fixture types, lamp bases, voltage, emergency circuits, dimming methods, color requirements and heat conditions before specifying products. Decide whether a retrofit kit, a new fixture or a lamp replacement best fits the ceiling, controls and maintenance plan. Verify that emergency lighting and fire-life-safety systems remain compliant.
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →Scan for outdated or missing drivers - takes under a minuteDriver Scan →Commission the installation after it is complete. Confirm actual power, illumination, glare, color consistency, dimming response and compatibility with occupancy or daylight sensors. Disposal requirements for old lamps and ballasts may apply.
5. Add occupancy and daylight controls where they fit
Occupancy sensors can prevent lighting from remaining on in intermittently used rooms. ENERGY STAR reports potential lighting-cost savings of 15 to 30 percent from occupancy sensors. The result depends on vacancy time, sensor coverage, timeout settings and whether occupants override the system.
Good candidates include storage rooms, restrooms, meeting rooms, service corridors and other low-traffic spaces. Select ceiling, wall or ultrasonic technology according to room geometry and activity; a sensor that cannot see a seated worker will create complaints. Set a practical timeout rather than an excessively short period that causes nuisance shutoffs.
Rank #3
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Daylight controls can dim perimeter fixtures when windows or skylights provide adequate light. Confirm that ballasts or LED drivers support the control signal, that zones are laid out by daylight availability and that wiring can accommodate the controls. Test every zone at different times of day and document override procedures.
Recommended Free Tools
6. Tune HVAC set points and unoccupied operation
Thermostat setbacks during unoccupied periods reduce heating and cooling demand, provided the building can recover before occupants arrive. Calibrate thermostats, correct sensors affected by sunlight or drafts, clear supply and return vents and verify that thermostatic valves and dampers respond.
Use occupied, standby and unoccupied modes where the control system supports them. Avoid broad set-point changes that create humidity, freeze-protection or indoor-air-quality problems. For laboratories, healthcare areas, kitchens and other specialized spaces, ventilation and pressure requirements may limit setbacks.
Maintain heating and cooling equipment according to the manufacturer’s instructions. Dirty coils, blocked filters, low refrigerant charge, leaking valves and fouled heat exchangers force longer run times. Trend supply-air temperature, fan speed, static pressure and zone temperatures to distinguish a control problem from an undersized or failing component.
7. Retrocommission controls and correct interaction problems
Retrocommissioning systematically tests whether installed systems operate as intended. The process can uncover simultaneous heating and cooling, excessive outside air, incorrect economizer logic, disabled sensors, short cycling, overridden alarms and schedules that conflict across systems.
Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallCrashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteStart with point lists, sequences of operation and trend logs. Test representative air-handling units, terminal units, pumps, boilers and chillers under different loads. Correct programming, sensor calibration and actuator problems, then verify that changes persist after the contractor leaves.
Properly tuned commercial-building controls could cut modeled energy consumption by approximately 29 percent, according to a U.S. Department of Energy summary published in 2017 of a Pacific Northwest National Laboratory study. The model covered 34 control measures, 14 commercial building types and 16 U.S. climate zones. It is a modeled estimate, not a guaranteed result for an individual building.
Rank #4
- Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
- Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
- Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
- Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
- Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
8. Reduce unwanted heat transfer through the envelope
Air leaks, weak insulation, unshaded glazing and heat gain through roofs increase HVAC loads. Inspect door seals, loading docks, pipe and duct penetrations, roof assemblies, window frames and mechanical-room boundaries. Repair accessible leaks and damaged insulation before adding equipment.
Manage solar gain with exterior shading, interior shades or window film where appropriate. Reflective roof coatings can reduce heat absorption on suitable roof systems, but they do not replace damaged insulation or solve air leakage. Evaluate climate, roof condition, warranty requirements, glare and winter heating effects before selecting a coating or film.
Use infrared inspection, smoke testing or blower-door methods when a qualified professional determines they are suitable. Envelope work can affect ventilation and combustion safety, so balance tighter construction with required outdoor-air rates and make-up air.
9. Improve motors, fans, pumps and distribution
Variable-frequency drives (VFDs) let fans and pumps match speed to load instead of running at full output and throttling through dampers or valves. Efficient motors, correctly sized equipment and balanced air and water systems are also listed by ENERGY STAR as rapid-payback opportunities.
Before installing a VFD, confirm motor compatibility, minimum safe speed, cooling at reduced speed, bypass requirements, harmonics, controls integration and the driven equipment’s operating envelope. A drive cannot fix an incorrectly sized fan or a blocked filter. Measure flow, pressure and power at representative operating points, then tune static-pressure or differential-pressure resets.
Hydronic balancing prevents some zones from receiving too much flow while others starve, reducing complaints and unnecessary pump operation. Air balancing should be performed after major duct, diffuser or control changes, with results recorded for future troubleshooting.
The Tool Desk
Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →10. Optimize domestic hot water and other supplemental loads
Hot-water equipment is one of the building assets the Department of Energy identifies for assessment. Inspect storage-tank temperature, recirculation schedules, pipe insulation, leaks, mixing valves and end-use patterns. A recirculation pump that runs continuously in an unoccupied building can waste both pumping energy and heat.
Best Value
- Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
- 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
- Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
- Hard hat clip- attaches for easy access
- Quick dry time with reduced smearing and marking
Set controls to provide required temperatures and hygiene protection without excessive storage or distribution losses. Insulate accessible hot-water piping, repair dripping fixtures and use low-flow fittings where codes and user needs permit. Evaluate heat-pump water heating, high-efficiency boilers or controls only after measuring demand and confirming electrical capacity, recovery requirements and space conditions.
Also inventory plug loads, commercial kitchen equipment, refrigeration, compressed air and process loads. Shut down or schedule equipment that is not needed, but preserve data, security, ventilation and life-safety functions. Supplemental loads add heat that the cooling system must remove, so reducing them can lower both electric consumption and cooling demand.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Sequence projects so one improvement supports the next
EPA’s ENERGY STAR guidance recommends a staged path: retrocommission the building, reduce lighting loads, reduce supplemental loads, improve air distribution, and then upgrade heating and cooling equipment. This order reflects system interactions. Lower internal and envelope loads can reduce required airflow and equipment capacity, allowing a later replacement to be smaller and less expensive.
- Retrocommission: correct schedules, sensors, sequences, dampers, valves and control overrides.
- Reduce lighting: remove unnecessary operating hours, improve daylight use, install efficient fixtures and add suitable controls.
- Reduce supplemental loads: address plug loads, hot water, refrigeration, kitchen equipment and process waste.
- Improve distribution: balance air and water, repair ducts and pipes, and apply VFDs where measurements support them.
- Upgrade heating and cooling: size new equipment from measured post-improvement loads, not old nameplate capacity.
Skipping directly to a larger chiller, boiler or rooftop unit can lock in oversizing, short cycling and higher first cost. Coordinate design, controls, electrical work, commissioning and maintenance responsibilities in the project plan.
How to compare measures for your building
| Decision factor | Questions to answer |
|---|---|
| First cost and payback | Can operations or maintenance staff implement it now? What labor, controls, electrical and structural work is required? Is the expected return based on a checklist potential, a model or measured results? |
| Building fit | What are the climate, occupancy pattern, floor plan, ventilation rules and comfort requirements? |
| Compatibility | Will fixtures, drivers, sensors, motors, HVAC equipment and building-management systems communicate and operate safely together? |
| Maintenance | Who will clean, calibrate, trend and repair the new system, and are replacement parts available? |
| Interaction | Could the measure change heating, cooling, airflow, humidity, electrical demand or equipment sizing later? |
| Verification | What baseline, meter, trend or inspection will show whether the measure worked? |
Start with low-cost, quick-return work when it addresses a known problem. Reserve capital-intensive replacements for systems that remain inefficient after controls, maintenance and load reductions are complete. A commercial energy auditor, retrocommissioning provider, HVAC contractor, lighting retrofit contractor or building-automation specialist can supply the measurements and commissioning needed for complex facilities.
Common mistakes and how to avoid them
- Assuming a published percentage is guaranteed: ENERGY STAR ranges and the DOE’s 29 percent control estimate describe potential or modeled outcomes. Treat them as screening information, then verify actual results.
- Ignoring operating schedules: New equipment cannot compensate for lights, fans or pumps running during vacancy.
- Changing set points without checking ventilation: Specialized spaces may require continuous airflow, pressure control or humidity management.
- Installing incompatible controls: Confirm sensor coverage, driver or ballast capability, wiring, network protocols and override behavior before purchase.
- Replacing equipment before reducing loads: Measure post-retrofit demand so replacement heating and cooling systems are not oversized.
- Failing to commission: Require functional tests, trend logs, staff training and written sequences of operation.
- Overlooking maintenance ownership: Assign responsibility for filters, sensors, schedules, alarms and seasonal inspections in the operating plan.
A practical implementation checklist
- Assemble bills, floor area, schedules, maintenance records and equipment inventories.
- Perform an audit and nighttime walkthrough; record waste by location and system.
- Correct schedules, set points, filters, coils, leaks, insulation and control overrides.
- Measure lighting levels and identify daylight, lamp-removal, LED and occupancy-control opportunities.
- Trend HVAC temperatures, pressures, flows and runtimes before changing equipment.
- Prioritize projects by cost, expected impact, compatibility, maintenance and interaction.
- Write a sequence of operation and commissioning plan for every controls or equipment project.
- Verify energy and demand after implementation against the baseline, adjusting for weather and occupancy.
- Train operators and schedule seasonal reviews so savings persist.
Commercial energy efficiency is an operating discipline as much as a construction project. The strongest Earth Day plan is one that measures the building, removes waste in the correct sequence, and keeps people responsible for the settings and maintenance that determine real-world performance.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.