Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan NowHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction
crop damage

How to Document Crop, Drainage and Access Impacts Before Utility Construction Begins

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Build a dated, mapped baseline before any utility crew enters the property. Photograph representative crop areas, field entrances, tracks, gates, drainage outlets and visible tile features; record crop stage, normal water movement, soil and access conditions; and preserve plans, easements, correspondence and farm records. Continue the same location-based record during construction and after restoration so each change can be tied to a place, date and practical farming effect.

This record does not replace a survey, appraisal or legal advice, and it does not guarantee compensation. Exact duties, valuation methods, restoration standards and deadlines depend on the utility, project approvals, agreement language and jurisdiction.

As an Amazon Associate I earn from qualifying purchases.

Start with a baseline before construction access is granted

Document conditions while the farm is operating normally and before survey crews, vehicles, clearing or excavation alter the site. A baseline is most useful when it is specific enough for someone unfamiliar with the farm to understand what existed, where it was and why it mattered.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Set a firm cutoff date

Choose a date before the first project-related disturbance. Put that date on the cover of a digital and paper file. If work is already imminent, complete the record immediately and note any areas that could not be inspected because of weather, standing water, crop height or restricted access.

#1 Best Overall
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Identify the project and people

Record the utility or developer, project name, parcel or legal description, contact details for the land agent and contractor, planned start date, and the portion of the property identified in the proposal. Keep a log of every site visit, notice, call and message. Write down who attended, what was discussed and any promised follow-up.

Use a consistent file system

  • Create folders for maps, photographs, crop records, drainage information, agreements, correspondence, estimates, invoices and completed repairs.
  • Name photos with the date, field or feature and viewpoint, such as 2026-10-17-NorthField-Entrance-EastFacing-01.
  • Keep original files with their metadata. Do not rely only on compressed images sent through a messaging app.
  • Back up the record in a second location and keep a read-only copy of documents sent to the project proponent.

The Ontario Federation of Agriculture (OFA) advises documenting the property before work and keeping records before, during and after construction. That practical approach is useful even where a different regulator or statute governs the project.

Map how the farm actually works

A route plan or easement drawing shows the project footprint, not necessarily the farm’s operating constraints. Make a working map that explains how equipment, people, water and livestock move through the property.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Base map and reference points

Start with an aerial image, farm map, survey or other reliable base. Mark north, field names, approximate acreage, parcel boundaries, public-road entrances and the proposed work area. Add fixed reference points such as building corners, utility poles, culvert heads, large trees or fence intersections. Give each photograph and observation a map reference or a clear description from one of these points.

Mark the affected footprint

Show the proposed right-of-way or work area, temporary workspace, access roads, staging areas, spoil piles, laydown areas and any alternative routes discussed. If the final limits are uncertain, draw the options separately and label them as proposed, confirmed or unknown. Do not estimate affected acreage from memory after crops have been removed; measure or map the area when practicable.

Explain seasonal constraints

Add notes for soft ground, spring thaw, wet harvest windows, irrigation periods, snow access, wildlife or conservation restrictions, and times when a particular entrance is the only practical route. A project agent may not know that a route that appears interchangeable is unusable for a loaded grain cart or during a wet month.

Record crop condition and production

Crop evidence should show both physical condition and the production activity that could be interrupted. Photograph representative areas, not just the most damaged-looking plants, and identify why each area is representative.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Information to capture

  • Field name or number, mapped location and approximate acreage.
  • Crop, variety or hybrid where relevant, planting date, growth stage and intended use.
  • Stand density, visible vigor, weeds, disease, pest injury, lodging, erosion or pre-existing stress.
  • Planting, input, yield, sales and delivery records that relate to the affected acreage.
  • Specialty, seed, processing or other contracts with timing, quality or segregation requirements.
  • Expected harvest window and operations that could be disrupted by traffic, dust, fencing or blocked access.

Photograph a wide view that shows the field context and closer views that show plant condition. Include a scale when documenting rut depth, erosion or damaged plants. Record weather and recent field operations so later reviewers can distinguish project effects from an unrelated storm, disease or pre-existing condition.

Keep a production record that can be updated

Use a simple table or spreadsheet with one row per field or mapped area. Record the baseline date, crop stage, expected yield basis, affected acreage and later observations. Preserve source documents rather than replacing them with a single total. OFA identifies crop production, temporary crop loss and interruption of specialty or contracted crops as matters to consider.

Understand that valuation is local

Compensation methods differ. As an Illinois example, 220 ILCS 75/22 describes a method for covered pipeline projects using average per-acre yield on comparable adjacent acreage, the price received for the same crop on comparable acreage and the impacted acreage. That is an Illinois-specific statutory example, not a universal formula. Do not apply it to an electrical project, another state or another country without confirming that the law covers the project.

Rank #2
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Document drainage, grades and soil before ground disturbance

Drainage damage can appear months after construction, especially where tile is buried and the first heavy rain occurs after restoration. Record the system’s layout and its normal behavior before excavation or heavy traffic begins.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Map visible and known drainage features

  • Known subsurface tile lines, mains, laterals, junctions, cleanouts and outlets.
  • Open ditches, culverts, waterways, terraces, berms and erosion-control structures.
  • Field grades, low spots, recurring wet areas, ponding limits and normal flow directions.
  • Outlet condition, discharge location and the person or entity responsible for maintenance.
  • Irrigation infrastructure, pumps, wells or control structures where they interact with the work area.

Use existing drainage plans if available, but label their source and date. If a line is only inferred from farm knowledge, crop patterns or probing, mark it as approximate rather than surveyed. Photograph outlets and culvert inlets from a repeatable position, and include water conditions when they are visible.

Record soil and field-surface condition

Note soil type if known, topsoil depth information if available, surface firmness, rutting, compaction, erosion and pre-existing subsidence. Photograph representative surfaces and measure or describe existing ruts and depressions. Record recent tillage, tile maintenance, grading or repairs that affect the baseline.

OFA recommends raising tile drainage, grading and compaction concerns early. Illinois provisions for specified pipeline projects address surface and subsurface drainage and soil productive capacity. Wisconsin guidance for certain high-voltage transmission easements discusses tile repair and restoration. These examples show why a pre-work condition record matters; they do not establish the obligation for a different utility or location.

Capture weather context

For each pond, flow or wet spot, record the observation date, recent rainfall or snowmelt and whether the area was normally wet. Revisit representative points after a comparable rain event when possible. A single photograph without weather context may not establish whether a condition is new, seasonal or pre-existing.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Map access and normal farm operations

Access impacts are often operational rather than visible. Show how a blocked gate, narrowed turn or temporary road changes the time, equipment or labor needed to farm the remaining land.

Mark every route and entrance

  • Public-road entrances, field gates and the route to each field, building, bin, well and livestock area.
  • Gate widths, turning radii, bridges, culverts, soft shoulders and slopes that limit equipment.
  • Routes for combines, sprayers, grain carts, manure equipment, trucks and emergency vehicles.
  • Seasonal routes used only in dry, frozen or firm conditions.
  • Fences, livestock crossings, watering points and gates that must remain secure.

Photograph entrances from the road and from inside the field. Include a large piece of equipment in the frame when it helps show clearance, but identify the equipment and do not create a hazard to obtain the image.

Describe the consequence of losing a route

For each critical route, explain what happens if it is closed or narrowed: a crop may be unreachable at harvest, a truck may need to cross another owner’s land, livestock may be separated from water, or a detour may require travel on saturated soil. Record alternative routes and their limitations instead of assuming that any open gate is an adequate substitute.

OFA advises landowners to explain field and equipment access needs early. For a FERC-covered electric transmission right-of-way, the governing easement specifies restricted uses and permissions. Wisconsin guidance for certain high-voltage transmission easements also addresses access beyond the easement boundary. The actual agreement and jurisdiction control.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Use a repeatable photo and video protocol

Images are strongest when a reviewer can identify the place, direction, date and reason the image matters.

Rank #3
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
  1. Photograph the overall field or route from a fixed point.
  2. Take medium views that connect the feature to a gate, fence, outlet, building or other reference.
  3. Take close views of outlets, cracks, ruts, erosion, crop stress, damaged fencing or other conditions.
  4. Record the date, time, location, direction faced, weather and what the image demonstrates.
  5. Repeat the same viewpoints during construction and after restoration whenever safe and practicable.

Keep a photo index matching file names to map points and notes. Video can show water movement, traffic interference or the turning space required by equipment, but narrate the location and date at the start and keep the original file.

Preserve plans, agreements and written commitments

Store the project documents with the physical baseline. Keep the complete version of each document, including attachments and maps, rather than only a summary email.

  • Easements, rights-of-way, temporary access permissions, leases and compensation agreements.
  • Legal descriptions, surveys, route plans, drawings, environmental or drainage plans and construction schedules.
  • Written promises about topsoil handling, tile repair, grading, fencing, access, crop timing, restoration and weed control.
  • Notices, inspection reports, change orders, complaint records, repair proposals and settlement correspondence.
  • Invoices and receipts for agronomic, legal, appraisal, surveying, drainage or repair services.

PHMSA’s PIPA Recommended Practice ND26 addresses encroachments on transmission pipeline rights-of-way and recommends documenting, recording and retaining relevant agreements. It identifies location, legal descriptions, surveys, plans and drawings as useful information. It is a recommended practice for that subject, not a general crop-loss rule.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Raise practical concerns before signing or construction

Use the baseline to ask precise questions while the route, work methods and agreement terms can still change. Ask who controls each decision and request the answer in writing.

  • Which land, routes and temporary work areas are covered, and for how long?
  • When may crews enter, and what notice will be provided before each phase?
  • Who protects and repairs tile, ditches, culverts, fences, gates and waterways?
  • How will topsoil be stripped, stored and replaced, and how will compaction be tested or corrected?
  • Which entrances remain open, what detours are available, and who maintains temporary roads?
  • How are growing crops, specialty crops, seed contracts and delayed harvest handled?
  • How are damage reports submitted, acknowledged, inspected and resolved?
  • Who pays for agreed professional review, surveying, drainage design or appraisal?

Tracey Arts, director of the Ontario Federation of Agriculture, said in October 2024: “It’s important that farmers and rural landowners are informed if they are approached with an energy project opportunity. Before signing a lease or an easement agreement, make sure it fits into your plan for your farm or property.”

Keep the same record during construction

Do not replace the baseline with a single final inspection. Update the map and log as the work progresses.

Log each observation

For every change, record the exact location, date noticed, activity underway, crew or company if known, weather, practical farming effect and requested repair. Examples include a blocked entrance, broken tile, rutting, soil stockpiled in the wrong field, damaged fence, crop burial, standing water or an altered flow path.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Report promptly and retain proof

Send damage information through the project’s stated process and keep your own copy, including attachments and delivery confirmation. Prompt notice can allow inspection before a condition is covered or repaired, but it does not waive any contractual or statutory requirement. Continue photographing the condition before cleanup where safe.

Track temporary measures

Note when a temporary crossing, pump, culvert, gate or access road is installed, who installed it and whether it functions under wet conditions. Record failures and repeated repairs rather than treating the first temporary fix as final restoration.

Verify restoration after crews leave

Inspect at practical milestones: immediately after demobilization, after the first significant rainfall, during the next planting or harvest operation, and when drainage or access is expected to perform under seasonal stress. Use the same viewpoints and map references as the baseline.

Rank #4
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors) | Construction Pencils with Built-in Sharpener, Long Nib Deep Hole Pencil Marker, Heavy Duty Woodworking Pencil for Architect
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
  • Confirm the route, gate, fence, culvert and turning space are usable by the equipment that normally travels there.
  • Look for settlement, rutting, ponding, erosion, blocked tile outlets, crushed culverts and changed flow paths.
  • Check topsoil placement, rock or debris, weed growth, seedbed condition and crop establishment.
  • Record incomplete work, new damage and repairs that failed, with dates and photographs.
  • Keep estimates, invoices, weigh tickets, yield records and contractor reports that support the practical effect.

Share unresolved items with the proponent while preserving the complete record. A photograph can establish condition and location, but the amount of loss may require production records, measurements, expert analysis or an agreement-specific process.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Compare the arrangement before you agree

A temporary access agreement, an easement or right-of-way, a purchase and another proposed arrangement can have very different long-term consequences. Compare the documents on the same checklist.

Issue Questions to answer
Land and routes What parcel, corridor, entrances, temporary workspace and off-corridor routes are included?
Duration What are the construction, operating, renewal and termination periods?
Farm use Which crops, grazing, buildings, drainage work, fencing and equipment uses are permitted or restricted?
Construction timing What notice, seasonal limits and coordination procedures apply?
Restoration Who handles topsoil, grading, compaction, tile, waterways, fences, weeds and crop re-establishment?
Access Which routes stay open, who maintains temporary roads and how are detours approved?
Damage process Who receives notices, what evidence is required, how are inspections arranged and how are disputes handled?
Professional costs Does the document address reasonable legal, appraisal, surveying or drainage-review costs?

OFA describes these arrangements as having different long-term implications and recommends that agreements clearly address permitted farming and responsibility for damage and access. It also recommends a lawyer familiar with easements, rights-of-way, land purchases and expropriation, plus an appraiser qualified for agricultural property where appropriate. Project proponents will normally reimburse reasonable costs related to reviewing and completing land agreements according to OFA guidance, but verify what applies to the particular project and document.

Know which jurisdiction controls

There is no universal utility-construction documentation rule. Identify the project type, approval authority, land rights instrument and governing law before relying on a deadline, compensation formula or restoration promise.

Ontario infrastructure guidance

OFA’s October 6, 2026 guidance concerns infrastructure projects affecting Ontario farms. It is practical landowner guidance, not a universal statute. It emphasizes understanding requested rights, obtaining professional advice, identifying farm impacts early and documenting before work.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

FERC-covered electric transmission

FERC explains negotiation of rights-of-way, agreement-specific restrictions, counsel review and a process for raising restoration concerns. Its process is limited to matters within FERC’s authority; the easement and applicable state law may control other issues.

Illinois pipeline example

Illinois Compiled Statutes 220 ILCS 75/22 contains compensation provisions for affected landowners under the specified certificate and pipeline framework. It addresses crop damage, restoration, soil compaction or rutting and drainage. Confirm that the current project falls within that framework before using its method or terminology.

Wisconsin transmission example

A Wisconsin Department of Transportation utility-coordination guide reproduces provisions for certain high-voltage transmission easements, including topsoil, waterways, tile, fences, crops and access. Those provisions do not automatically govern another utility, voltage class or location.

Canadian federally regulated pipelines

Canadian Energy Regulator guidance imposes particular locate, consent and damage-prevention procedures for agricultural activities near federally regulated pipelines, including measured zones and thresholds. Those are Canadian pipeline rules, not general requirements for utility construction elsewhere.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Common documentation failures and fixes

Only photographing damage after the fact

Why it fails: There is no reliable comparison point, and crop stage or weather may have changed.

Best Value
Milwaukee 48-22-3104 Inkzall Point Marker, Fine, Black, 4-Pack
  • Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
  • 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
  • Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
  • Hard hat clip- attaches for easy access
  • Quick dry time with reduced smearing and marking

Fix: Create dated baseline views now, then repeat them at the same locations.

Keeping images without locations

Why it fails: A close-up cannot show which field, outlet or route it represents.

Fix: Use a map reference, fixed landmark, direction and photo index for every image.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Describing a tile line as certain when it is inferred

Why it fails: An inaccurate map can misdirect excavation and weaken later analysis.

Fix: Label information as surveyed, documented, observed or approximate, and identify the source.

Recording only the corridor

Why it fails: Farm impacts often occur at gates, turns, detours, outlets and off-corridor staging areas.

Fix: Map the complete operating route and explain the consequence of each interruption.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Relying on verbal promises

Why it fails: People, contractors and project phases change.

Fix: Send a written confirmation and retain the response with the agreement and plans.

Assuming one legal rule applies everywhere

Why it fails: Pipeline, electric-transmission and other utility regimes can use different rights, procedures and valuation rules.

Fix: Have local counsel identify the governing framework before signing or missing a notice requirement.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Printable baseline checklist

  • Project name, utility, contractor, contacts, parcel and proposed dates recorded.
  • Field, acreage, crop, stage, condition and production records preserved.
  • Proposed corridor, workspace, staging and access routes marked on a map.
  • Entrances, gates, turning areas, fences, livestock routes and seasonal constraints photographed.
  • Tile, outlets, ditches, culverts, waterways, grades, wet spots and flow patterns mapped.
  • Soil surface, topsoil, rutting, compaction and pre-existing damage described.
  • Every image indexed by date, location, direction and purpose.
  • Easements, permissions, surveys, plans, drawings and restoration commitments filed.
  • Access, crop timing, drainage, soil, fencing and professional-cost questions raised in writing.
  • Construction observations, notices, estimates, invoices and repairs logged by location and date.
  • Post-construction inspections repeated after weather and farming operations test the restoration.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.