Engineering and construction (EC) firms can compete more effectively for infrastructure work when they turn data from jobsites, designs, financial systems, equipment and external sources into decisions. The essential capability is not collecting more records; it is connecting information outside traditional enterprise-resource-planning (ERP) systems to project selection, estimating, delivery, margin control, safety and workforce planning.
This article explains the case made in a December 18, 2018 Building Design + Construction article summarizing Deloitte Consulting’s 2019 Engineering and Construction Industry Outlook, then translates that thesis into a practical operating framework. Its market figures and forecasts are historical and should not be read as current conditions.
As an Amazon Associate I earn from qualifying purchases.
Why analytics became an infrastructure-competition issue
Infrastructure projects are becoming more connected, data-intensive and difficult to manage. Owners increasingly expect teams to coordinate design, construction, operations, sustainability, safety and long-term asset performance. Firms that can interpret those information flows have a better basis for deciding which opportunities to pursue, pricing risk, coordinating delivery and demonstrating value after handover.
Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteWindows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallThe 2018 Building Design + Construction account of Deloitte’s 2019 outlook argued that engineering and construction companies would need to organize and analyze data generated beyond their traditional ERP platforms. That includes information from building-information-modeling (BIM) systems, project controls, sensors, equipment, drones, connected infrastructure, documents, field observations and external market sources. Analytics supplies the layer that turns those disparate signals into actions.
#1 Best Overall
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
The point is strategic: digital capability can determine whether a firm is credible for technology-intensive infrastructure work. It does not mean every contractor needs every emerging tool. It means leadership must know which decisions matter, which data supports them, and how to make the resulting insight usable for project teams.
What the 2018 outlook actually reported
The following figures belong to the period covered by the December 18, 2018 article. They are included for historical context, with the attribution and qualification given in that article.
| Figure | How it was presented | Qualification |
|---|---|---|
| Approximately 5% U.S. EC-industry growth in 2018 | Deloitte Consulting estimate reported by Building Design + Construction | A 2018 estimate, not a current growth rate |
| At least 344 mergers and acquisitions valued above $20 billion in 2018 | Activity reported in the December 18, 2018 article | The indexed account does not identify a primary deal-count publisher |
| $158 billion in global smart-city spending by 2022 | IDC forecast reported by the article | A forecast made before 2022, not a current spending figure |
| About 7.2 million U.S. construction workers | Workforce figure reported by the article | The article’s comparison describing both a post-recession high and an 18-year low is internally unclear and should not be repeated without the original context |
Deloitte principal Michelle Meisels, identified as the outlook’s author and Engineering and Construction Leader, was reported as predicting that labor shortages would continue through 2019. That was a dated prediction, not a present-day forecast. The article also cited an alliance between AECOM and Arrow Electronics as an example of scale meeting digital capability; the alliance’s status and scope should not be inferred today from that historical mention.
Recommended Free Tools
Where analytics creates value for an EC firm
Choose projects with evidence, not just volume
Business-development teams can combine owner requirements, geography, financing signals, schedule constraints, sector experience, labor availability and historical project performance before committing pursuit resources. A simple opportunity model can score strategic fit, expected margin, delivery complexity, contractual exposure and the firm’s ability to staff the work.
The useful output is not an automated yes-or-no decision. It is a documented view of assumptions: which conditions must hold for the project to succeed, which risks are uncertain, and what additional information would change the recommendation. That makes go/no-go reviews more consistent and gives executives a way to compare opportunities that otherwise look attractive for different reasons.
Rank #2
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
Protect shrinking margins earlier
Construction margins can erode through small, repeated variances: unproductive hours, material escalation, rework, late design information, change-order delays, equipment downtime or subcontractor performance. Analytics can compare the estimate, budget, commitments, progress quantities, cost-to-complete and cash position in one operating view.
Early-warning rules should focus on leading indicators rather than waiting for a monthly loss. Examples include productivity below the planned installation rate, committed cost rising faster than earned value, unresolved requests for information accumulating in a trade package, or forecast final cost moving beyond an approved tolerance. A dashboard is valuable only when a named manager owns the response and the system records the corrective action.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Deliver larger and more complex projects
Complex programs generate dependencies that are difficult to see in isolated spreadsheets. Linking schedule activities to design packages, procurement status, labor curves, inspections, safety observations and cost codes allows teams to identify bottlenecks before they affect the critical path.
Scenario analysis is particularly useful. A project team can test the effect of resequencing work, changing a material, adding a shift, reallocating equipment or accepting a design alternative. The model should show assumptions and confidence ranges; a single precise-looking forecast can hide weak or incomplete data.
Make better location and materials decisions
Infrastructure work depends on conditions outside the project boundary. Firms may need to evaluate access, logistics, climate exposure, utility capacity, permitting constraints, workforce availability and local supply chains. Combining external location data with internal productivity and cost history can improve early feasibility studies.
Rank #3
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Material decisions can be analyzed against installed cost, lead time, availability, maintenance implications, embodied impacts where required by the owner, and the risk of substitution. Analytics does not replace engineering judgment or specifications. It makes the trade-offs visible and records why a choice was made.
Support smart-building and smart-city delivery
Connected assets produce information during construction and operation. IoT devices, building controls, occupancy systems, utility meters and infrastructure sensors can support commissioning, performance monitoring and maintenance planning. An EC firm that understands the data architecture can contribute beyond physical installation by defining useful data structures, handover requirements and operating interfaces.
The opportunity described in the 2018 outlook was tied to urban growth and infrastructure demand, including IDC’s then-forecast $158 billion in global smart-city spending by 2022. That forecast is historical. The enduring lesson is that connected-project capability can be part of the value proposition when owners are procuring outcomes rather than isolated construction packages.
How connected construction generates usable data
BIM as a shared project information model
BIM can connect geometry and specifications with quantities, sequencing, costs, asset identifiers and handover information. Its value depends on agreed naming, ownership, revision control and exchange rules. A model that cannot be matched to field records or operational systems becomes another silo.
Robotic process automation for repetitive administration
Robotic process automation can handle rule-based tasks such as moving approved data between systems, checking fields, assembling recurring reports or notifying a user when a condition is met. It is most effective when the underlying process is stable. Automating a broken approval chain simply moves errors faster, so teams should document exceptions and audit logs before deployment.
Rank #4
- Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
- Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
- Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
- Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
- Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
Drones and site mapping
Drones can capture frequent aerial imagery, topographic information and progress evidence. A construction site mapping drone is one optional data-capture category, not a universal requirement. Commercial surveying, airspace, privacy, insurance, pilot qualification, site safety and data-processing requirements vary by jurisdiction and project. Equipment suitability must be evaluated with current regulations and the owner’s specification; the 2018 outlook did not compare models or establish that any particular drone is appropriate.
Wearables and augmented reality
Wearables can provide location, environmental or physiological data when workers consent and the program has clear safety and privacy boundaries. Augmented-reality tools can overlay design information or work instructions in the field. Both technologies require reliable connectivity, training and a process for acting on alerts. Collecting sensitive data without governance can damage trust and adoption.
Interfaces for decisions and scenarios
Field supervisors, project managers and executives need different views of the same information. A useful interface lets each role see the current status, the source of a metric, the threshold that triggered attention and the next action. Scenario tools should allow users to change a small number of meaningful variables and understand the consequences rather than presenting an opaque score.
A practical implementation sequence
- Define the decisions. Select two or three decisions with measurable business impact, such as bid selection, cost-to-complete forecasting, equipment utilization or design-change response. Write down who decides, how often and what evidence is currently missing.
- Map the data beyond ERP. Inventory BIM models, estimating files, schedules, project-management records, field apps, equipment logs, drone imagery, quality records, safety observations and external datasets. Record the owner, update frequency, format, access rights and known quality problems.
- Choose a controlled pilot. Use a project or portfolio with a committed sponsor, representative complexity and a team willing to change its routine. Set a baseline before introducing the dashboard or model so improvement can be measured.
- Standardize definitions. Agree on cost codes, activity IDs, location breakdowns, asset identifiers, revision rules and status meanings. Establish which system is authoritative for each field and how corrections are approved.
- Build the smallest useful workflow. Start with a reliable feed and an action: for example, a forecast variance that creates an assigned review, or a design-package status that alerts procurement. Avoid a large “single pane of glass” that no one uses.
- Validate with practitioners. Have estimators, superintendents, engineers, commercial managers and safety leaders test whether the outputs reflect field reality. Investigate disagreements instead of hiding them; they often reveal inconsistent definitions or missing context.
- Measure adoption and outcomes. Track response time, forecast accuracy, rework, unresolved issues, reporting effort, safety follow-up and margin variance. Also measure whether users trust the data and complete the associated action.
- Scale with governance. Create access controls, retention rules, cybersecurity responsibilities, model-version management and a process for retiring unused metrics. Replicate only workflows that produced a demonstrated benefit.
People and capability are part of the system
Technology cannot compensate for a shortage of people who understand both construction and data. The outlook connected digital transformation with employer brand, apprenticeships, technical schools and training. That combination remains practical: firms need field leaders who can interpret analytics, analysts who understand production realities, and managers who can change workflows without undermining safety or quality.
Free tools Windows power users keep installed
One-click scans. No signup required.
- Build blended roles. Pair a data specialist with a project practitioner so models reflect actual sequencing, contracts and site conditions.
- Train for interpretation. Teach teams how a metric is calculated, what its limitations are and which action follows a threshold.
- Use apprenticeships and technical-school partnerships. Structured pathways can develop surveying, BIM, controls, data-management and field-technology skills while expanding the recruiting pipeline.
- Protect professional judgment. Analytics should inform engineering, commercial and safety decisions, not remove accountability from licensed or experienced professionals.
Common failure modes and fixes
Collecting data without a decision owner
Symptom: teams produce attractive dashboards but meetings do not change. Fix: assign an owner to each metric, define the trigger and document the required response.
Best Value
- Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
- 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
- Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
- Hard hat clip- attaches for easy access
- Quick dry time with reduced smearing and marking
Trying to integrate everything at once
Symptom: a long implementation stalls while interfaces and definitions multiply. Fix: begin with one decision, a limited data set and a measurable baseline.
Confusing more data with better data
Symptom: contradictory progress, cost or quantity figures appear in different systems. Fix: establish authoritative sources, validation checks and revision responsibility before expanding collection.
Ignoring contracts and privacy
Symptom: teams capture worker, location or owner data without clear rights, retention or permitted use. Fix: involve legal, commercial, information-security and workforce representatives at design time, not after deployment.
Do these 3 things before closing this tab:
1Scan for outdated or missing drivers - takes under a minute2Clear out junk files and repair common Windows errors3Fix the driver behind crashes, sound loss and screen glitchesBuying a tool before defining the operating model
Symptom: software is installed but field teams continue using informal workarounds. Fix: document the process, incentives, training and support required; then assess whether a technology category fits.
How to judge whether an analytics approach fits
When evaluating a platform, internal build or service, use criteria tied to the firm’s work rather than a generic feature checklist:
- Integration: Can it exchange data with existing ERP, BIM, estimating, scheduling and field systems without creating duplicate records?
- Project-level reporting: Can managers move from portfolio trends to the contract, location, activity or cost code that requires action?
- Implementation burden: What standardization, migration, training and ongoing administration are required?
- Scale and complexity: Does it support the firm’s project sizes, joint ventures, subcontractor relationships, geographies and security obligations?
- Workforce fit: Can supervisors and craft professionals use it in the field, with the connectivity and devices available on the project?
- Auditability: Can users see where a number came from, when it changed and who approved an exception?
These axes are decision criteria, not a ranking of products. The 2018 outlook did not evaluate vendors or establish a preferred technology stack.
A defensible competitive position
An EC firm can present analytics as a delivery capability when it links the technology to owner outcomes: earlier risk visibility, transparent cost and schedule control, better coordination, safer work, reliable asset information and more informed lifecycle decisions. The strongest proposal describes the data sources, governance, people and actions—not merely a list of devices or software categories.
The historical outlook’s central warning is therefore still useful as a management test: if important project information remains scattered outside the systems leaders use to make decisions, digital investment has not yet produced operational capability. Firms that define the decisions first, connect the relevant data and train people to act on it are better positioned to pursue complex infrastructure work without treating analytics as a technology side project.