October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PCOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
Bettesworth Construction
backyard pools

A French Pool Dig Found $800,000 in Gold. The Real Lesson Is Pre-Dig Planning.

A backyard pool project near Lyon, France uncovered gold bars and coins worth about $800,000. For US homeowners, the practical lesson is not treasure hunting. It is that pool excavation is a serious construction project with permits, utilities, soil, drainage, electrical safety, access, and change-o

By Bettesworth Construction Team 13 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A homeowner near Lyon, France reportedly started a backyard swimming pool project and uncovered a discovery most people only imagine: five gold bars and numerous coins wrapped in plastic bags, valued at roughly $800,000. Authorities were notified in May 2025, reviewed whether the find had archaeological importance, and reportedly allowed the homeowner to keep it after determining the gold appeared relatively recent, traceable to a local refinery, and not state-owned archaeological property.

That is the headline. The construction lesson is more useful.

A pool dig is not just a hole in the yard. It is excavation, spoil management, utility coordination, soil evaluation, drainage design, structural planning, electrical bonding, safety barriers, inspections, access logistics, and budget control. On our job sites, the problems that cost owners real money are rarely dramatic discoveries. They are the avoidable conflicts: an unmarked private line, a narrow side yard that cannot fit equipment, a fence layout that fails inspection, an equipment pad boxed in by landscaping, or a slope that turns a simple pool into a retaining-wall project.

If you are considering an in-ground pool in the United States in 2026, plan the project like a small building job. The realistic finished cost for many standard in-ground pools clusters around $45,000 to $90,000, with national consumer pricing data showing an average near $65,909. Broader installed ranges run from about $35,000 to $120,000, or roughly $80 to $250 per square foot, depending on pool type, region, site conditions, hardscape, utilities, and features. Difficult access, rock, groundwater, retaining walls, drainage corrections, and premium finishes can push the number much higher.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
TEMPO 551 Advanced Underground Utility Locator, IP54-rated Underground Wire Locator, Buried Wire Locator, Dual-Frequency Underground Wire Tracer
  • PROFESSIONAL-GRADE UTILITY LOCATOR – Locate underground electrical lines, telecom cables, irrigation wires, and metallic pipes with precision over 1 mile (1.6 km) and depths up to 20 feet (6 m) with the 551 underground wire locator.
  • DUAL FREQUENCIES + INTELLITRACK NOISE REJECTION – Simultaneously transmit two frequencies and eliminate AC interference with proprietary IntelliTrack digital filtering for accurate readings in noisy environments with the 551 cable locator.
  • PEAK & NULL RECEIVER MODES – Choose between peak or null response to fine-tune your search and detect anomalies with confidence, even in complex underground environments with 551 buried wire locator.
  • FLEXIBLE CONNECTION OPTIONS – Use direct wire connection , inductive clamp, or built-in antenna on 551 wire locator for maximum adaptability on active or inactive systems.
  • BUILT FOR THE FIELD – Rugged, IP54-rated, and ergonomically designed with a lightweight receiver and durable case for reliable use in demanding job sites.

What Happened in the France Backyard Gold Discovery?

The reported discovery happened in Neuville-sur-Saone, near Lyon, France. A homeowner excavating for a backyard swimming pool found plastic bags containing five gold bars and a large number of coins. The total value was reported at about $800,000.

The homeowner reportedly notified authorities, and French cultural officials evaluated whether the find should be treated as archaeological property. Because the gold appeared relatively recent and the bars were traced to a local refinery, officials reportedly did not classify it as a state-owned archaeological discovery. With no owner identified, the homeowner was allowed to keep it.

That outcome should not be treated as a rule for American property owners. Treasure, artifacts, human remains, suspected evidence, buried utilities, abandoned tanks, hazardous material, and historical objects can all trigger different legal and safety obligations. Rules vary by state, municipality, property title, preservation law, abandoned-property law, and the nature of the object itself.

The practical takeaway is simple: if excavation uncovers something unexpected, stop work and slow the job down before anyone moves, pockets, cuts, breaks, or covers anything.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The Stop-Work Protocol for Unexpected Finds

Most pool excavations uncover ordinary things: roots, old fill, buried concrete, irrigation lines, drain pipe, abandoned landscape wiring, or construction debris. Sometimes crews find conditions that require a formal response. The first hour matters because a rushed decision can create safety, legal, insurance, and documentation problems.

What to Do Immediately

Use this field protocol if a crew uncovers anything unusual during a pool dig:

  • Stop excavation in that area. Do not keep digging to “see what else is there.”
  • Keep people back. Treat unknown containers, tanks, pipes, wires, bones, weapons, or chemical smells as hazards until proven otherwise.
  • Photograph the condition before moving it. Include wide shots, close shots, and a reference point such as a tape measure or grade stake.
  • Do not remove or clean the object. Moving it can damage evidence, destroy context, or create ownership disputes.
  • Notify the contractor and property owner in writing. A short text or email with photos and location is better than a verbal-only update.
  • Call the correct local authority if needed. That may mean building officials, police, fire department, environmental health, utility owner, or historic-preservation office.
  • Document downtime and direction. If the project pauses, the change-order and schedule record should show why.

On our projects, buried debris is handled differently than possible human remains, suspected artifacts, fuel tanks, live electrical, or utility conflicts. A pile of old brick may only require removal and haul-off. A corroded tank, suspicious container, or bone-like material should stop the job until the proper authority clears it.

What a Backyard Pool Really Costs in 2026

Homeowners often compare pools by shell price. That is the wrong number to build a budget around. The number that matters is the finished, permitted, inspected, swimmable project cost. That includes the pool, excavation, plumbing, equipment, electrical, bonding, decking, fencing or barriers, drainage, restoration, startup, and required inspections.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Pool Type or Cost Item Practical 2026 Planning Range What Drives the Number
Standard in-ground pool $44,499-$87,349; average about $65,909 Size, region, access, depth, equipment, decking, fencing, and inspections
Broad fully installed in-ground range $35,000-$120,000, or about $80-$250 per sq. ft. Pool type, site difficulty, hardscape, utilities, labor market, and features
Concrete or gunite $50,000-$120,000+ Custom shape, structural work, finish, tile, spa, slope, and regional labor
Fiberglass $55,000-$100,000+ Shell size, crane access, patio, plumbing runs, equipment, and finish package
Vinyl liner Often $25,000-$75,000+ for basic projects Lower upfront cost, but liner replacement affects lifetime cost
Above-ground pool Roughly $1,000-$6,000 before upgrades Site prep, deck, electrical, ladder or barrier compliance, and equipment
Professional maintenance About $100-$300 per month; $116-$356 per visit in some 2026 data Pool size, service frequency, chemicals, opening, closing, and repairs
Contingency 10%-20% of project cost Buried debris, bad soils, rock, utility conflicts, drainage, retaining walls, upgrades

Those numbers are national planning ranges, not bids. A flat, open yard in a lower-cost market is not the same job as a tight urban lot in New Jersey, California, or a coastal metro. High-cost Northeast and coastal markets can push standard projects above national averages. Some 2026 regional builders cite many New Jersey in-ground projects at $65,000 to $120,000 or more, with gunite pools beginning around $160,000 and rising from there.

The Pre-Dig Checklist We Want Homeowners to Complete

A clean pool project starts before excavation. The best way to reduce surprises is to gather the constraints early and force the design, budget, and contract to reflect them.

Rank #2
6014157 Leica DD130 Underground Utility and Cable Locator with low frequencies (512Hz – 640Hz) Depth Package
  • Extended trace range over the Leica DD120 with additional low frequencies (512Hz and 640Hz)
  • Kit includes DD130 Locator, DA175 1 Watt Signal transmitter, and carry bag which offers a turn key Package for locating underground utilities
  • Safely locate underground power, water, gas, and Cable lines
  • Automatic pinpointing at depths up to 33 feet (With Sonde - not included) with power, radio, auto modes
  • Health check and start up test each time you turn on the unit to ensure proper functionality

1. Property Survey, Setbacks, and Easements

Do not place a pool from a fence line guess. Fences are often not on the property line. A current survey helps confirm boundaries, easements, setbacks, septic areas, wells, drainage easements, utility easements, and accessory-structure limits.

Setbacks vary by jurisdiction. A pool may need to be a certain distance from the house, property lines, overhead utilities, septic systems, slopes, retaining walls, and other structures. Equipment pads may have separate noise or setback rules. If the pool location shifts 4 feet after permitting, that can affect patio layout, fence gates, drainage slopes, and utility routes.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

2. 811 Utility Marking and Private Line Locating

Call 811 before digging. Public utility marking is essential for gas, electric, water, sewer, cable, and communications lines. Schedule it early enough that markings are fresh when excavation begins.

Also understand what 811 may not mark. Private lines often require separate locating. That can include irrigation, landscape lighting, propane lines, pool or spa lines from an old installation, private electric to a shed, low-voltage gate wiring, drainage pipe, or a detached-garage feeder. We have seen “simple” backyard work become expensive because a private line was never mapped and nobody had photos from the original installation.

3. Access Width and Equipment Route

A pool builder needs a real route into the yard. A compact machine may pass through a 4-foot opening, but production excavation, gravel delivery, concrete access, shell placement, crane setup, and spoil haul-off may need more. Fiberglass pools can require crane access and a clear delivery path. Concrete pools may need room for excavation equipment, steel work, plumbing, shotcrete access, and finish crews.

Before signing, identify what will be removed and rebuilt: fence panels, gates, landscaping, pavers, irrigation, retaining edges, or side-yard hardscape. Put restoration in writing. “Access by owner” is where many budget arguments start.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

4. Soil, Slope, Rock, and Groundwater

Soil conditions can change the job quickly. Rock excavation, groundwater, soft fill, expansive clay, poor compaction, and buried construction debris can all add cost. On sloped lots, the pool shell may be the easy part. Retaining walls, stairs, railings, drainage, fence transitions, and access paths can dominate the budget.

If the yard has a meaningful slope, price the retaining walls and drainage before signing the pool contract. A pool set into a slope may need engineered walls, geogrid, subdrainage, waterproofing, guardrails, or stepped patios. Those are not decorative extras. They are what make the project stable, inspectable, and usable.

5. Drainage Plan

Get the pool, deck, fence, and drainage designed together. Separating them often creates inspection problems, awkward gates, poor slopes, and expensive rework. Patio surfaces should drain away from the house and pool where appropriate, without sending water onto a neighbor’s property or into the pool structure.

Typical exterior flatwork needs planned slope, often around 1/8 inch to 1/4 inch per foot depending on surface and local requirements. Channel drains, area drains, swales, sump discharge routing, and retaining-wall drainage should be coordinated before concrete or pavers are installed.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
TEMPO Communications 501 Tracker II Underground Wire Locator, Buried Wire Locator, Underground Wire Tracer, Locate Wires 7 Ft Deep (2026 Model)
  • ACCURATE UNDERGROUND WIRE LOCATOR. Quickly isolate, trace the path and determine the depth of buried conductors (wires or metallic pipes) over distances of 4,000 feet (1.2 km) and depths of 7 feet (2.2 m) with the 501 underground wire locator.
  • EASILY LOCATE AND TRACE Electrical lines, Communications cables, Electric dog fence cables, Fish tape and Metallic pipes, Invisible fence wires, Outdoor or Landscape lighting cables with 501 buried wire locator. Trace Electric, Power, Coax, Telephone, and Utility lines with the 501 underground wire locator.
  • EFFICIENT: Save yourself hours to trace buried cables, wires, or pipes. With inductive signal detection, this cable and buried wire locator can be used on active or dead systems, making it quick and easy to trace the path and determine the depth of buried wires and trace metallic pipes.
  • COMPLETE PORTABLE KIT: 501 buried wire locator comes with a transmitter assembly, receiver assembly, inductive coupler (clamp), built-in inductive antenna, two 8-foot (2.4 m) test leads with heavy-duty alligator clips, and a durable polyethylene case, making it a complete package for all your location needs.
  • CONNECTION OPTIONS: Options for direct connection, inductive clamp, and inductive antenna allow active or dead systems location. Transmitter output and receiver sensitivity are fully adjustable for maximum accuracy.

Permits, Barriers, and Electrical Safety Are Not Paperwork Details

Pool codes exist because the risks are real. A backyard pool combines water, electricity, children, guests, slippery surfaces, pumps, suction, chemicals, and nighttime use. The permit process can feel slow, but it forces several safety checks that homeowners should want anyway.

Pool Barriers and Gates

Many jurisdictions use barrier concepts similar to national model guidance: a minimum barrier height, limits on openings, self-closing and self-latching gates, latch-height rules, door alarms or powered covers in some cases, and restrictions that prevent easy climbing. Local code controls, so confirm with the building department before ordering fencing.

Do not treat the fence as a last-minute accessory. The fence line affects gates, steps, retaining walls, patios, equipment access, landscaping, and inspection approval. A beautiful pool that cannot pass final inspection is not finished.

Electrical Bonding, GFCI Protection, and Equipment Location

Pool electrical work should be handled by qualified professionals familiar with pool codes. Bonding is not the same as grounding. The system must reduce voltage differences between conductive parts around the pool, including items such as reinforcing steel, metal components, ladders, rails, equipment, and water-bond fittings where required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Schedule the bonding inspection before steel, rebar, fittings, or conductive components are covered. Once concrete, backfill, or decking hides the work, proving compliance becomes harder and more expensive.

GFCI protection, proper disconnects, listed equipment, trench depths, conduit, lighting requirements, pump wiring, and heater connections should be part of the permit package. Plan working clearance around pumps, filters, heaters, automation panels, salt cells, and valves. Equipment that is boxed into landscaping may look tidy on day one but becomes a service problem when a pump or filter needs replacement.

How to Compare Pool Bids Without Getting Misled

Three pool bids can look similar and still describe very different projects. The most useful document is not a glossy rendering. It is the inclusion and exclusion sheet.

Ask every contractor to define exactly what is included:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Permits, plan preparation, engineering, and inspection coordination
  • Excavation, rock clauses, dewatering, and unsuitable-soil handling
  • Spoil haul-off, dump fees, and rough grading
  • Plumbing pressure testing before backfill
  • Electrical scope, bonding, GFCI protection, subpanel work, and utility upgrades
  • Gas line sizing and run length if a heater is included
  • Deck square footage, material thickness, base prep, and drainage
  • Fence, gates, alarms, covers, and barrier-code responsibilities
  • Startup chemicals, owner training, plaster care, and first service visit
  • Landscape restoration, irrigation repairs, sod, mulch, and access-route repair

Require a written change-order process. Pool projects are vulnerable to scope creep once the yard is open and the owner can see the space. That is when people add a tanning ledge, more deck, a fire feature, automation, extra lighting, a retaining wall upgrade, or a larger equipment pad. Those may be good decisions, but they need priced approvals, schedule impacts, and clear drawings.

Pool Type Comparison: Concrete, Fiberglass, Vinyl, and Above-Ground

There is no single best pool type. The right choice depends on budget, site access, design goals, climate, maintenance tolerance, and how long you expect to own the home.

Rank #4
Sale
RIDGID 19238 NaviTrack Scout Locator, Underground Pipe Locator and Underground Cable Location Device Small
  • COMPACT SONDE AND LINE LOCATOR: Perfect for SeeSnake cameras, remote transmitters, or flushable sondes; targets pipes, cables, and energized lines; use with SeeSnake inspection reels or other sondes
  • MULTI-DIRECTIONAL TECHNOLOGY: The antenna detects signals from all directions, maximizing signal strength and eliminating false peaks or nulls, ensuring accurate target location
  • ENHANCED DETECTION CAPABILITIES: Features 4 Sonde and 5 Line trace mode frequencies; the digital readout delivers real-time signal strength with no false peaks, ensuring fast, accurate locates
  • PRECISE TARGETING: Micro-mapping verifies locate positions with on-screen markers for poles in front of and behind your target; depth calculations automatically display when directly over the target
  • ALL-IN-ONE PACKAGE: Includes a carrying case for easy transport and protection, plus surface marker chips, an instructional video, an operator’s manual, and 4 C-cell batteries

Concrete or Gunite Pools

Concrete and gunite pools are the most customizable. They make sense for complex shapes, integrated spas, vanishing edges, unusual depths, custom benches, and high-end finishes. They also tend to have the highest installed cost and a longer construction schedule. Many projects land around $50,000 to $120,000 or more nationally, with premium regional custom work far higher.

Lifetime cost matters. Some 2026 industry sources cite acid washing around $300 to $1,000 every 3 to 5 years and resurfacing around $8,000 to $10,000 every 10 to 15 years. Finishes, water chemistry, climate, and maintenance habits affect those intervals.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Fiberglass Pools

Fiberglass pools use a manufactured shell set into an excavated hole. They can be faster to install than concrete when access is good and the shell fits the design. Installed costs often fall around $55,000 to $100,000 or more. Some 2026 dealer data places small fiberglass pools around $74,000, medium pools around $109,000, and large pools around $113,000.

The constraints are shape, size, delivery, and crane logistics. If the shell cannot reach the backyard safely, the job changes. Confirm access before assuming fiberglass will be simpler.

Vinyl-Liner Pools

Vinyl-liner pools often carry a lower upfront price, with basic 2026 projects commonly around $25,000 to $75,000 or more. They can be a practical option when the owner wants an in-ground pool but does not need a fully custom concrete design.

The tradeoff is liner replacement. Compare lifetime cost, not just contract price. A cheaper initial build can still be the right decision, but the maintenance schedule should be understood before the deposit is paid.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Above-Ground Pools

Above-ground pools are materially cheaper, often roughly $1,000 to $6,000 for many systems before decks, electrical work, fencing, and site prep. They are not free from code concerns. Barriers, ladders, electrical safety, level base preparation, drainage, and equipment placement still matter.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

When to DIY vs. When to Hire a Pro

A homeowner can take on some pool-adjacent work, but the line should be clear. DIY can save money on landscaping restoration, furniture assembly, planting beds, low-risk cleanup, and some owner-managed finish selections. Handy owners may also coordinate HOA paperwork, insurance calls, product research, and maintenance routines.

Do not DIY structural excavation, pool electrical, gas lines, bonding, engineered retaining walls, shotcrete placement, pressure plumbing, crane placement, or code-required barrier work unless you are licensed and qualified for that scope in your jurisdiction. The cost of rework can erase the savings quickly. Worse, hidden defects around bonding, suction, gas, drainage, and retaining walls can create safety risks that are not obvious until the pool is in service.

A practical split is this: hire professionals for anything buried, structural, electrical, gas-fired, inspected, or life-safety related. Consider DIY only for visible, reversible, non-code-critical finish work after the pool is safe, inspected, and operational.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
u-LOCATE Pipe & Cable Locator (u-LOCATE)
  • Easy to Use
  • Left / Right Arrows Guide You To Buried Utility
  • Single Frequency Locator
  • 1W Transmitter
  • 1 Year Warranty

Insurance, Resale, and Maintenance Planning

Call your insurance carrier before construction starts. A pool can affect liability coverage, umbrella policy recommendations, fencing requirements, and premiums. Some carriers care about diving boards, slides, trampolines, short-term rentals, and whether the yard is fully enclosed.

For resale, be honest. Pools can help in warm climates and pool-heavy neighborhoods. They can hurt value if they are old, unsafe, expensive to maintain, poorly placed, or mismatched to the buyer pool. A well-designed pool with clean decking, safe barriers, efficient equipment, good drainage, and documented permits is easier to defend than a tired pool with mystery plumbing and inspection issues.

Maintenance should be budgeted like a utility, not treated as an afterthought. Professional service commonly runs about $100 to $300 per month in many markets, and 2026 consumer data reports professional maintenance at $116 to $356 per visit, averaging $236. Seasonal opening and closing can run about $150 to $300 each. Filters, pumps, heaters, salt cells, automation boards, covers, cleaners, and finishes all have replacement cycles.

The Bottom Line for Homeowners

The French homeowner found gold while digging a pool. Most homeowners will not. What they may find is a utility conflict, bad soil, a buried stump, an old drain line, groundwater, rock, or a code issue that should have been handled before excavation.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A backyard pool is one of the most enjoyable outdoor upgrades a home can have, but it is still construction. Start with a survey. Call 811. Confirm private utilities. Price access and haul-off. Design drainage, fence, deck, and pool together. Require clear inclusions and exclusions. Keep a 10% to 20% contingency. Photograph buried plumbing and electrical work before it disappears. Schedule inspections before covering anything. Use written change orders.

That discipline may not uncover treasure, but it protects the project you are actually paying for: a safe, permitted, durable pool that works with the house, the yard, and the budget.

Frequently Asked Questions

What happened in the backyard pool gold discovery in France?

A homeowner near Lyon, France reportedly found five gold bars and many coins wrapped in plastic bags while excavating for a backyard swimming pool. The find was valued at roughly $800,000. Authorities reviewed it and reportedly allowed the homeowner to keep it after determining it was recent, not archaeological property, and had no identifiable owner.

Could a homeowner in the United States keep treasure found during a pool dig?

Do not assume so. US rules vary by state, municipality, property title, historic-preservation law, abandoned-property law, and the type of object found. Human remains, artifacts, suspected evidence, hazardous material, tanks, or utilities can trigger reporting and safety obligations. Stop work, document the find, and contact the appropriate authority.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much does an in-ground pool cost in 2026?

Many standard US in-ground pool projects cluster around $45,000 to $90,000, with national data showing an average near $65,909. Broader fully installed ranges run from about $35,000 to $120,000, or roughly $80 to $250 per square foot. Site access, slope, rock, groundwater, decking, fencing, utilities, and region can move the price significantly.

What should homeowners do before digging for a pool?

Get a current survey, confirm setbacks and easements, call 811, locate private utilities, review HOA rules, check insurance requirements, plan equipment access, price spoil haul-off, evaluate drainage, identify tree and root conflicts, confirm permit requirements, and carry a 10% to 20% contingency for unknowns.

What pool work is safe to DIY?

Homeowners can often handle landscaping restoration, furniture, planting, cleanup, HOA paperwork, and routine maintenance. Hire qualified professionals for excavation, structural work, electrical bonding, GFCI-protected circuits, gas lines, engineered retaining walls, pressure plumbing, barriers, and any work that must pass inspection.

What is the most commonly missed cost in a pool project?

The most commonly missed costs are site-related: access repairs, spoil haul-off, rock excavation, drainage corrections, retaining walls, fencing, electrical upgrades, gas line runs, decking expansion, and landscaping restoration. These should be priced before signing, not discovered after the yard is open.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Quick Recap

Bestseller No. 2
6014157 Leica DD130 Underground Utility and Cable Locator with low frequencies (512Hz – 640Hz) Depth Package
6014157 Leica DD130 Underground Utility and Cable Locator with low frequencies (512Hz – 640Hz) Depth Package
Safely locate underground power, water, gas, and Cable lines; IP54 rating against dust and water keep you working longer in tough jobsite conditions
$2,898.00
Bestseller No. 5
u-LOCATE Pipe & Cable Locator (u-LOCATE)
u-LOCATE Pipe & Cable Locator (u-LOCATE)
Easy to Use; Left / Right Arrows Guide You To Buried Utility; Single Frequency Locator; 1W Transmitter
$1,521.00

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.