DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
Skip to content
Bettesworth Construction
infrastructure planning

Orrong Connect: What’s Happening with Orrong Road?

Orrong Connect’s planning and development phase has concluded, but Main Roads has not announced a selected design, construction funding or a start date.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Orrong Connect’s planning and development phase has concluded, according to Main Roads Western Australia. The study findings are intended to inform future planning and development of a business case; Main Roads has not announced a selected design, construction funding or a construction start date. So the “sinking” of Orrong Road is not confirmed as an approved or scheduled construction project.

What is Orrong Connect?

Orrong Connect is Main Roads Western Australia’s planning study for Orrong Road between Great Eastern Highway and Leach Highway. The corridor serves local trips as well as regional movement, linking Perth Airport, the Perth Hills, Welshpool and Kewdale. Main Roads describes traffic volumes as having increased significantly since Graham Farmer Freeway opened and says the corridor often operates at capacity. Main Roads’ project background

What is the project’s current status?

Main Roads’ current project page says the planning and development phase has concluded. Its findings are intended to inform future planning and the development of a future business case. That is a study milestone, not confirmation that a construction design has been selected or that work will begin. The official pages do not announce construction funding or a start date. Main Roads’ Orrong Connect project page

Why is change being considered?

Main Roads reports that around 65,000 vehicles, or 85,000 people, travel along Orrong Road each day. It also estimates that congestion along Orrong Road and Graham Farmer Freeway costs the local economy up to $65.7 million a year in lost productivity. These are agency-published estimates, not independently verified counts in the material cited here. Main Roads’ project background

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The study sought improvements to safety, congestion, connectivity and liveability. Main Roads says it used broad consultation, stakeholder engagement and a deliberative panel to explore options and help inform future planning. The available official information does not state a final panel recommendation.

Has the sunken-road concept been approved?

No approval of a sunken expressway is established by the current official project pages. The concept has a history: a 2019 planning study proposed a lowered expressway between Leach Highway and Great Eastern Highway, with surface roads crossing at designated intersections. Main Roads says the concept aimed to separate regional and local traffic, but also had impacts on adjacent properties. This earlier proposal is context for the study, not evidence that it has been selected as the final design. Main Roads’ project background

Rank #2
Revell 1970 Plymouth Road Runner Plastic Car Model Building Kit 1:24 Scale
  • Revell Model Kit #14531, Skill Level 5, Contains 77-Parts, Recommended for ages 13 and up
  • Detailed 440+6 V-8 engine, hood scoop that can be positioned open or closed
  • Detailed interior with separate side panels and a front bench seat
  • Molded in white and clear with chrome plated parts and black vinyl tires
  • Illustrated assembly instructions. Requires paint and glue. (not included)

Project materials identify decision factors that include safety, congestion, connectivity and liveability, as well as heritage, place, environment, transport innovation, and economic costs and benefits. The available information does not show how those competing considerations were resolved. Earlier PerthNow reporting noted concern about median trees and urban canopy, but the sources cited here do not establish the final treatment of those concerns.

What did the community say?

PerthNow reported in March 2025 that a 2024 Main Roads engagement survey had 705 respondents. According to that report, 80 per cent said the corridor required improvement, 70 per cent ranked reduced travel time as their top priority, and 34 per cent identified trees and urban canopy as a priority. These figures are PerthNow’s account of the earlier survey, not a current survey or a finding published on the current Main Roads project pages. PerthNow, 6 March 2025

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
AMT 1968 Plymouth Road Runner Customizing Kit 1:25 Scale Model Kit
  • A CLASSIC BUILD WITH STREET-MUSCLE DETAIL: AMT’s 1/25 scale 1968 Road Runner is the customizing project for serious builders who are looking for a straight-up classic. Add it to your collection today!
  • SPRINKLED WITH AUTHENTIC OPTIONS: The Road Runner is a classic ride for classic builders. Fully paintable, it includes an EXPANDED SHEET of authentically detailed water-slide decals. Build it stock or custom using optional features, including two different engine builds, stock or custom wheels and pad-printed tires featuring stock redline, or custom Goodyear details. Wrapped up nicely in vintage-style packaging that really pops!
  • QUICK SPECS: 1/25 Scale, 110+ Parts, 8 inches long once assembled. Parts molded in white and clear with black vinyl tires. Some parts are chrome plated. Plastic model kit paint and cement required (Testors or Tamiya brands recommended). Paint guide included in kit. Skill Level 2. For ages 14+
  • THE PERFECT PRESENT: Don't know what to get dad for his birthday? Or maybe you have an avid hobbyist or collector in your life. This model kit makes an ideal gift for any occasion!

In the same report, a Main Roads spokesperson said: “We want to connect communities either side of Orrong Road and give all road users — trucks, cars, buses, pedestrians and cyclists — opportunities to move about safely and efficiently.” That statement describes the agency’s aim; it does not announce a final design.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

When will construction start, and will congestion improve?

Main Roads has not published a construction start date on the official pages cited here, and the completed planning phase does not itself establish that construction is funded or scheduled. The evidence also does not establish whether, when or by how much traffic conditions will improve. Those answers depend on future planning and a business case, as well as any subsequent decisions on design and delivery.

Rank #4

PerthNow’s March 2025 article said detailed planning and development was then expected to run to December 2026 and described the project as years from breaking ground. That was a timetable reported at the time, not the current status: Main Roads now says the planning and development phase has concluded. In the same 2025 report, then-Federal Minister Catherine King said the government had committed $10 million for planning works, including development of a business case to assess the expressway’s scope, design and cost. That reported planning commitment is not evidence of construction funding. PerthNow, 6 March 2025

Quick Recap

Bestseller No. 2
Revell 1970 Plymouth Road Runner Plastic Car Model Building Kit 1:24 Scale
Revell 1970 Plymouth Road Runner Plastic Car Model Building Kit 1:24 Scale
Revell Model Kit #14531, Skill Level 5, Contains 77-Parts, Recommended for ages 13 and up; Detailed 440+6 V-8 engine, hood scoop that can be positioned open or closed
$25.05
SaleBestseller No. 4
Road System Learning Kits Woodland Scenics
Road System Learning Kits Woodland Scenics
Made by Woodland Scenics
$21.80
Bestseller No. 5
Revell 14530 1969 Pontiac GTO Judge 1:24 Scale 63-Piece Skill Level 4 Model Car Building Kit
Revell 14530 1969 Pontiac GTO Judge 1:24 Scale 63-Piece Skill Level 4 Model Car Building Kit
Revell Model Kit #14530, Skill Level 4, Contains 63-Parts, Recommended for ages 12 and up; Optional rear spoiler and factory-stock Judge decal graphics in four color schemes.
$31.93
Best Value
Revell 14530 1969 Pontiac GTO Judge 1:24 Scale 63-Piece Skill Level 4 Model Car Building Kit
  • Revell Model Kit #14530, Skill Level 4, Contains 63-Parts, Recommended for ages 12 and up
  • Optional rear spoiler and factory-stock Judge decal graphics in four color schemes.
  • Highly detailed 370-horsepower Ram Air IV 400-cubic-inch V-8 engine. Ram Air hood with optional hood-mounted tachometer.
  • Detailed Rallye II wheels. Choice of stock and Hurst T-handle floor shifters.
  • Molded in white and clear with chrome plated parts and black vinyl tires. Requires paint and glue. (not included)

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.