Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
Skip to content
Bettesworth Construction
Burt Street

Fremantle Council Backs Burt Street Housing and Arts Proposal, With Conditions

Fremantle’s planning committee gave qualified support to the Burt Street proposal in 2021. A 2026 update says stage one, including 23 social-housing apartments, was under construction.

By Bettesworth Construction Team 3 min read

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The City of Fremantle Planning Committee supported the Burt Street mixed-use development in December 2021—but its support was qualified. It asked for work on visitor parking, the height and street impact of one building, and housing and accessibility commitments. A February 2026 parliamentary answer later said the first stage, with 153 apartments including 23 for social housing, was under construction.

What the committee supported

On 1 December 2021, the City of Fremantle Planning Committee resolved to advise the Western Australian Planning Commission that it “broadly supports” the proposed Public Works mixed-use development at 19–21 and 23–25 Burt Street, based on plans dated 23 September 2021. The resolution concerned those submitted plans and lots; it was not unconditional approval of every feature or the final development. The committee minutes record the decision and its requested follow-up.

The committee also noted that the development adjoins road reserves managed by the City. Work in those reserves would require separate City approval, and the proponent was asked to engage with the City on public-realm design and funding, including potential additional parking on Vale and Skinner streets.

What concerns accompanied the support

Visitor parking

The committee estimated a possible shortfall of up to 100 visitor parking bays. It said visitor bays in the basement could restrict their use and that existing on-street parking was limited. It asked the WA Planning Commission to seek resolution of the issue before submitting its Responsible Authority Report to the Joint Development Assessment Panel. The 100-bay figure was the committee’s estimate of a potential shortfall, not the final parking count of the project. The minutes set out the committee’s concern.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
SnapHouse Architectural Scale Model Building Kit, Ages 13+
  • Custom Architectural Scale Models: Design and build custom Architectural Scale Models of your own unique house designs at 1:48 scale
  • Easy to Use: No special skills or additional materials are required
  • Reusable Parts: All parts are reusable so you can design, build, dismantle, and rebuild as often as you like
  • Versatile Design System: Each unique shape in the SnapHouse system can be used for multiple purposes and orientations
  • Flexible Architectural Styles: Create your own architectural style from traditional to ultra-modern and everything in between

Building height and Skinner Street

The committee said Building 1 did not align with the height controls in Local Planning Scheme 4 and Local Planning Policy 3.16. It asked for a revised design addressing the effect of levels five and six on the Skinner Street frontage. This records the committee’s assessment of the 2021 plans, not a finding about the building as eventually constructed.

Housing mix and adaptable homes

Citing a 2015 Memorandum of Understanding, the committee asked for a demonstration that, among the first 180 dwellings, 10–15% would be public housing and at least 45% would be a mix of public and affordable housing. It also called for at least 25% of all dwellings to be readily adaptable for people with disabilities under the cited Australian Standard provisions. These were the committee’s stated requirements and request for demonstration in 2021; they should not be treated as a description of the later stage-one tenure mix.

Rank #2
Pitsco Education True 1:16 Scale House Framing Kit | Balsa Wood Model Home | Educational Architectural Framing Kit for Blueprint Reading, Construction & STEM Learning | Ages 14+
  • Authentic, Real-World Construction Experience: The Pitsco True Scale House Framing Kit delivers a realistic construction model rather than simple assembly play. Students build a true 1:16 scale house model using 485 precision-cut balsa wood pieces, following professional-style house plans and construction methods aligned to real building practices. This architectural framing kit helps learners understand stud framing, scale lumber, and structural design in a way traditional model kits cannot.
  • Blueprint Reading & Skill-Building: Designed as a hands-on architecture lesson for ages 14+, this model house framing kit guides students through a structured learning progression. Learners begin by interpreting blueprints, measuring to scale, and understanding architectural drawings before cutting, framing, and assembling the structure. The challenge builds accuracy, focus, and confidence, making it ideal for homeschooling, high school engineering projects, and blueprint reading practice tools.
  • Choice-Based Design & Structural Comparison: Unlike most balsa wood house kits, this architectural model making supply allows students to choose between two realistic roof systems: truss or hip. Comparing a truss building kit to a hip roof framing model gives learners firsthand experience with real-world structural approaches used in residential construction, reinforcing problem-solving, interpretation, and decision-making while maintaining authentic construction standards.
  • Classroom-Ready & Collaborative by Design: This classroom building kit is designed for individual or paired work, supporting collaboration and communication as students divide tasks, measure materials, and assemble the wooden house frame model together. Instructions are student-facing, with minimal teacher prep required beyond gathering shared tools. Projects can be stored safely during multi-week builds, making it well suited for extended classroom use.
  • Career Pathways in Construction & Design: The True Scale House Framing Kit connects hands-on building to real careers in construction, architecture, engineering, drafting, and skilled trades. By applying construction terminology, reading plans, and working with a realistic construction model, students gain exposure to Career and Technical Education (CTE) construction concepts and civil engineering foundations, positioning this as a powerful architecture study kit and vocational training resource.

How the project description changed

Published project figures describe different dated proposal versions, so they should not be combined into one definitive specification.

Source and date What it described
Government of Western Australia, 2020 $129 million announced project; 265 apartments, six artist live-work studios and a maker space. The announcement estimated 530 construction-support jobs and forecast up to $205 million in economic activity; these were projections, not reported outcomes. Government announcement
PerthNow, 16 December 2021 A 272-apartment proposal with 486 car bays, two restaurants, a gym, an arts studio and a performing arts centre. These are figures reported for that proposal version. PerthNow report
WA Legislative Council answer, 25 February 2026 Stage one under construction, to deliver 153 apartments, including 23 for social housing. The answer did not give a total dwelling count for all stages. Legislative Council answer

The $129 million figure was the State’s 2020 announced value, not a verified final project cost. Likewise, the 265- and 272-apartment counts relate to separate earlier descriptions and should not be read as the completed total.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What the latest construction and funding update says

In its 25 February 2026 answer to the Legislative Council, the WA Government said stage one was under construction and would provide 153 apartments, of which 23 would be used for social housing. It described the project as a commercial build-to-sell development funded by DevelopmentWA and Edge Visionary Living, with construction funding to be recovered from settlement revenue. The answer also identified a $1.48 million Infrastructure Development Fund grant and said there was no other State grant funding for the project. Further stages were to be announced in due course. Read the parliamentary answer.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Approval context and later planning policy notice

The City’s application page identifies the proposal as “Mixed Use Development – Public Works” and links to public documents and submission information. The City’s development application page is the local source for those materials. PerthNow reported in December 2021 that final approval and related conditions rested with the Metro Inner-South Joint Development Assessment Panel. The sources cited here do not establish a complete account of later approvals or the final design for every stage.

Rank #4
MINDWARE Art-CHITECT 3-D Home Design Architecture KIT
  • MINDWARE ART-CHITECT 3-D HOME DESIGN ARCHITECTURE KIT

The City reported an amendment to Local Planning Policy 3.16 | Burt Street in March 2026, describing it as an update and reformatting for clarity and ease of use. That notice alone does not establish that the development’s approved design changed. City policy amendment notice.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.