Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
Skip to content
Bettesworth Construction
bridge construction

North Landing Bridge Construction: Project Status and 2020 Replacement Plan

USACE recommended an east-alignment high-rise replacement for North Landing Bridge in 2020, but available official sources do not confirm authorization, construction funding, or a current schedule.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

North Landing Bridge construction is not confirmed by the official sources available here. The U.S. Army Corps of Engineers (USACE) recommended a replacement design in 2020, but said congressional authorization and construction funding were still needed. The available sources do not establish whether either step has since occurred, so they do not confirm that construction is underway or provide a current schedule.

Where the bridge is and why replacement was proposed

North Landing Bridge crosses the Albemarle and Chesapeake Canal, part of the Atlantic Intracoastal Waterway. It connects North Landing Road in Virginia Beach with Mount Pleasant Road in Chesapeake; USACE’s feasibility report says the bridge itself lies entirely within Chesapeake. USACE owns and operates the existing bridge as part of the waterway project. USACE project page and feasibility study report and environmental assessment.

The existing crossing is a two-lane, double-swing drawbridge that opened in 1951. USACE’s 2019 project materials describe it as 24 feet wide curb to curb, with no shoulders, and give its design capacity as 8,000 vehicles per day. A 2020 USACE release said it carried more than 11,000 vehicles per day under normal conditions. These are historical agency figures, not a current traffic count. The agency identified structural and functional obsolescence, high maintenance demands, repair-related closures, and vehicle-weight limits as concerns. USACE project page; USACE, August 27, 2020.

What USACE recommended in 2020

In August 2020, USACE’s Chief of Engineers signed a report recommending a two-lane, fixed high-rise bridge east of the existing crossing. The agency’s plan described a bridge 3,360 feet long and 46 feet 4 inches wide, with nearly 70 feet of minimum vertical clearance, an 8-foot structure depth, and a roadway elevation of 78 feet. USACE reported an estimated project cost of $98.5 million at that time. These are dimensions and an estimate for the 2020 recommended plan, not confirmation of a final design or current cost. USACE, August 27, 2020.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Sale
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
  • Build 20 different models that each teach about force, load, compression, tension and more
  • Over 285 interchangeable building pieces
  • Includes 36-page, illustrated experiment manual and Assembly guide
  • Skill level: Intermediate

The proposed fixed bridge was intended to avoid road closures when vessels pass and, according to USACE’s study materials, require less maintenance than movable alternatives. The agency’s earlier comparison considered east and west fixed alignments similar in cost at that stage; the 2020 recommendation selected the east alignment. A fixed crossing also presents trade-offs: the study described longer wetland crossings, possible effects on residences and a proposed city park, and adverse effects on historic resources. USACE project page; USACE, August 27, 2020.

What had to happen before construction

USACE described the 2020 report as a recommendation for congressional authorization, not as approval to begin construction. The agency said the report would undergo review by the Assistant Secretary of the Army for Civil Works and the Office of Management and Budget before formal submission to Congress. Authorization would make the project eligible for construction appropriations; it would not itself establish that construction money had been provided.

Rank #2
ROBOTIME 3D Puzzle Wooden Craft Kits with LED Light DIY Tower Bridge Construction Model Kit to Build for Teens Brain Teaser Puzzle Home Decor Birthday Gifts
  • 【DIY London Tower Bridge Model Kit】This 3D London Tower Bridge wooden puzzle with LED light is one of the iconic buildings in Britain, ancient and elegant. Assemble Size: 14.1x2.9x4.6in.
  • 【Unique Gifts】This Tower Bridge construction model kit is the best gift for teens, friends, family members, architectural enthusiasts around the world or those who love handmade crafts on birthday, Christmas, or another occasion.
  • 【English Instruction】This DIY model Tower Bridge Kit cut with exquisite laser technology and accompany english instruction, the matierial is environmentally friendly, non-toxic, 113 pcs easy to assemble, recommended for over 14 years old. Kids can also assemble with the help of adults.
  • 【Fun Project】This 3D puzzles can greatly stimulate the spatial imagination of players, improve the graphics recognition ability, enhance the player's observation and hand-eye coordination ability, Three-dimensional Puzzles is also a very interactive activity for both children & adults
  • 【Perfect Decoration】Our Big Ben model kit is good for Home decoration. It looks great to show on your table, bookshelf, add it in your collections or hang on the window, wherever you put, it makes your home more exquisite and vintage.

The 2020 announcement identified Chesapeake as the nonfederal sponsor and expected future owner, with operations and maintenance responsibility after completion. USACE then projected Chesapeake’s annual post-completion responsibility at $185,000. That figure is a historical projection, not a current estimate. USACE also said preconstruction engineering and design typically could last up to three years and cautioned that the overall process might take five to ten years or more. Those were planning estimates in the 2020 release, not a present-day schedule. USACE, August 27, 2020.

What is known—and what remains unconfirmed

The official sources cited here establish the recommendation and process described in 2020, but not subsequent project milestones. They do not confirm whether Congress authorized the replacement, whether construction appropriations were made, whether design advanced, or whether work began. They also do not establish a current construction footprint, parcel impacts, or the status of mitigation. Without newer confirmation, a current start date, completion date, or claim that the project is canceled would be unsupported.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
  • BUILD A REAL DA VINCI INSPIRED BRIDGE Construct a working model based on Leonardo da Vinci’s famous self-supporting bridge design. This hands-on wooden STEM kit demonstrates real engineering principles through an engaging and rewarding building experience.
  • EDUCATIONAL STEM LEARNING EXPERIENCE Explore concepts in engineering, architecture, physics, and history while building. Great for students, hobbyists, makers, homeschool projects, classroom activities, and anyone interested in mechanical design.
  • APPROXIMATELY 1 HOUR BUILD TIME Designed to provide an immersive yet manageable project experience. The completed bridge makes an impressive display piece and conversation starter once assembled.
  • HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
  • Made from durable precision-cut wood components with detailed illustrated instructions. A thoughtful gift idea for teens, adults, engineers, history enthusiasts, and STEM lovers.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Environmental, historic, and property considerations

USACE identified the Albemarle and Chesapeake Canal Historic District as listed in the National Register of Historic Places and described the existing bridge as a contributing property. Its study anticipated adverse effects from demolishing the bridge and changing the canal landscape, and discussed coordination with Virginia’s Department of Historic Resources, archaeological survey, and mitigation work. The agency also noted archaeological sensitivity near the Great Dismal Swamp and a small cemetery near the road. These are study findings and planned coordination, not evidence that mitigation is complete. USACE project page.

The feasibility report says permanent and temporary construction footprints would be determined during the Preconstruction, Engineering, and Design phase. It discusses property interests and construction easements, wetland effects, and an intention to avoid private-property impacts where practicable. The cited material does not establish current parcel-level impacts. USACE feasibility study report and environmental assessment.

Quick Recap

SaleBestseller No. 1
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
Build 20 different models that each teach about force, load, compression, tension and more
$45.95
Bestseller No. 3
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
$21.99
Rank #4
Fascinations Metal Earth Brooklyn Bridge 3D Metal Model Kit
  • HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
  • NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
  • BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
  • FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
  • HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.