B3 is Bridge 3 in Georgia’s Kvesheti–Kobi road project: a reinforced-concrete arch bridge crossing the Khadistskali River. Project reports describe twin box-section arch ribs built outward in cantilevered segments, with temporary cable tie-backs and form travellers helping support and control the incomplete arch. “B3” is the project’s identifier, not a general bridge type.
Where is the B3 bridge?
B3 crosses the Khadistskali River in Lot 2 of the Kvesheti–Kobi road project, part of Georgia’s North–South Corridor. The Roads Department of Georgia’s project documents identify it as the “B3 – Arch bridge over the River Khadistskali.” The wider road project includes new highway sections, bridges and tunnels; B3 is one bridge, not a tunnel or a name for the whole route. The corridor serves mountainous terrain where winter weather and avalanche risk can disrupt access. The Roads Department’s January–June 2022 monitoring report gives broader Lot 2 context and lists the Asian Development Bank and European Bank for Reconstruction and Development as project funders.
What kind of arch bridge is B3?
Contractor-related project reports describe B3 as an upper-deck, or deck-type, reinforced-concrete arch with two separated box-section arch ribs. The bridge deck sits above the arch ribs, which carry loads from the deck and transfer them toward their supports. The reported main arch span is 286 m: the August 2026 release calls it a clear span, while the October 2026 report calls it a net span. Those terms are source-specific and should not be treated as proof of identical measurement conventions.
Bridge dimensions vary by source and date, so the figures are best read with their original descriptions rather than combined into a single definitive specification.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
#1 Best Overall
- BUILD A REAL DA VINCI INSPIRED BRIDGE Construct a working model based on Leonardo da Vinci’s famous self-supporting bridge design. This hands-on wooden STEM kit demonstrates real engineering principles through an engaging and rewarding building experience.
- EDUCATIONAL STEM LEARNING EXPERIENCE Explore concepts in engineering, architecture, physics, and history while building. Great for students, hobbyists, makers, homeschool projects, classroom activities, and anyone interested in mechanical design.
- APPROXIMATELY 1 HOUR BUILD TIME Designed to provide an immersive yet manageable project experience. The completed bridge makes an impressive display piece and conversation starter once assembled.
- HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
- Made from durable precision-cut wood components with detailed illustrated instructions. A thoughtful gift idea for teens, adults, engineers, history enthusiasts, and STEM lovers.
| Figure | Source and wording |
|---|---|
| 426 m overall length; 164 m height; three lanes | Roads Department of Georgia, 2019 Lot 2 project document. |
| 437.875 m total length; 286 m main arch clear span | China Railway 23rd Bureau Group/PRNewswire-related project reporting, August 2026. |
| 437.875 m total length; 286 m main arch net span; 164 m from deck to valley floor | China Railway 23rd Bureau Group/PR Newswire APAC contractor report, October 2, 2026. |
The available reports do not explain why the 2019 length differs from the 2026 total length, or whether the height and deck-to-valley figure use the same reference points. These are published project figures, not independent remeasurements. A minister quoted by the Roads Department in a July 2026 update described a 166 m-high arch bridge under construction; that figure also differs from the 164 m measurements above, and the update does not reconcile them.
How is B3 being built?
Project reporting identifies cantilever casting with form travellers and a cable-stayed tie-back or anchoring system. In a cantilever sequence, crews extend the arch progressively from its supports rather than relying on a continuous temporary scaffold spanning the valley. Form travellers support and position the work at the advancing end as successive concrete segments are formed. Temporary stays and anchorage help hold and control each incomplete portion while construction proceeds; the opposing sides must ultimately be brought together at the arch crown.
Rank #2
- Build 20 different models that each teach about force, load, compression, tension and more
- Over 285 interchangeable building pieces
- Includes 36-page, illustrated experiment manual and Assembly guide
- Skill level: Intermediate
This explains the reported method in general engineering terms, not a complete B3 construction procedure. The published accounts do not specify the bridge’s segment lengths, cable-force schedule, foundation design, detailed pour sequence or closure tolerances. The contractor’s October 2, 2026 report says project discussions covered arch alignment and stress control, cable hoisting, construction procedures, intelligent monitoring, winter safety and high-precision closure control; it is not a detailed method statement or independent audit.
Why do wind and winter conditions matter?
During cantilever construction, the arch is incomplete and its structural response differs from that of the finished bridge. Wind can affect the exposed, advancing sections and the temporary support system, so construction-stage checks matter alongside checks for the completed structure. B3’s setting adds severe weather considerations: an August 2026 project release described Level 9 winds, temperatures as low as −20°C and snow accumulation up to 2 m. The release does not give the wind averaging interval or measurement convention, so Level 9 should not be converted into a single precise wind speed.
Rank #3
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES GOLDEN GATE BRIDGE - 2.5 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 14.45 L x 0.94 W x 2.95 H inches. 1:7535 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
The same release says physical wind-tunnel tests were carried out at Hunan University’s National Key Laboratory of Bridge Engineering Safety and Resilience. It reports tests for critical construction stages and the completed-bridge configuration, with particular attention to the planned asymmetric arch-ring closure. According to that release, predicted vibration, deformation and stress during closure would remain within contractual or specification limits, and the completed bridge would meet operational wind-safety requirements. Those are project-reported conclusions; the underlying laboratory report and test parameters are not provided in the cited account.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What is the latest reported construction status?
On July 15, 2026, the Roads Department said construction was continuing and described an arch bridge as under active construction. Contractor-related reporting identified main-arch closure as a 2026 milestone. An October 2, 2026 contractor report documented a site visit and ongoing work, but did not confirm that the arch had closed. The latest status established by these reports is therefore that closure was a target, not a confirmed completed event.
Rank #4
- THE WOODEN SYDNEY BRIDGE 3D MODEL KIT COMES WITH UNIQUE DESIGN YOU WILL LOVE - Be proud to display your assembled Sydney 3D Bridge Wood Puzzles and share your love for iconic landmarks in Sydney Australia. This wooden 3d puzzle bridge makes a model kit for kids who loves architecture model kits, bridge building kit, and 3D building sets for adults. Ideal for kids to start getting interested in building bridges or young engineers building kit.
- THE SYDNEY 3D BRIDGE WOODEN MODEL KIT PUZZLE IS FOR EVERYONE WHO LOVES ICONIC PUZZLES - The Sydney Bridge 3D wooden puzzles for adults and kids is a craft kit to build for those who love playing mind games. Parents can gift 3D wooden puzzles, or architecture model building like this Sydney Bridge to improve mental speed and problem solving skills of their kids. A good bonding project for family, or as kids architecture kit project for school.
- INCLUDED WITH THE PURCHASE OF THE 3D BRIDGE WOOD PUZZLE KIT - Includes 1 Sydney 3D Bridge Wood Craft Puzzle Decor Model Kit with 55 unfinished natural wood puzzle pieces, manual, and 1 paper for sanding the edges. This DIY puzzle bridge building kit for kids can be painted or colored for a more personalized look. Most parts doesn't require glue as the pieces are interlocking. It measures 16.54Lx4.13Wx5.31H inches. Paint and Glue not included.
- HIGH-QUALITY WOODEN PUZZLES FOR ADULTS AND KIDS - This miniature iconic 3D Puzzle Sydney Bridge Wood Model Kit is made of high-grade 3mm natural wood. All wooden puzzle pieces are laser cut and sanded thoroughly to ensure smooth edges. This bridge building educational 3D puzzle feature realistic details of the Sydney bridge, like its arch and towers. Playfully paint this architecture puzzle toy bridge model kit for kids after assembling.
- IDEAL USE FOR THE SYDNEY 3D BRIDGE ADULTS AND KIDS WOOD BUILDING KITS - Challenge your kids or even yourself to build this DIY 3D wooden puzzle Sydney bridge. A perfect addition to your kids wood project, wooden building kits for adults, or wooden Australia puzzles collection. This architecture model building kit puzzle toy can help kids develop their skills in building wood bridge, raise their IQ, problem solving, and shape recognition.
In the Roads Department’s account of its July 2026 site inspection, Georgia’s Infrastructure Minister Revaz Sokhadze called it “a unique engineering structure — a 166-metre-high arch bridge with no equivalent in the region.” That is an attributed project statement, not an independently verified regional comparison.
Quick Recap
Best Value
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
- BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Clear out junk files and repair common Windows errorsFree Scan →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →