BETTESWORTHConstruction

DIgSILENT PowerFactory

#28 of 41 in Electrical Design Software

Free trial

Plans and prices

PlanPriceBilled
Demo licence$0Free of charge for 28 days.
Commercial licence — perpetual—Perpetual use; initial purchase price includes the first 12 months of maintenance and support.
Commercial licence — subscription—6- or 12-month terms; subscription fee includes maintenance and support and renews automatically unless cancelled with 30 days’ prior written notice.
Commercial licence — time-limited—Fixed term of 6 or 12 months.

From DIgSILENT PowerFactory's own pricing page, checked 11 Oct 2026. Every plan

What the maker publishes

Applications
The product supports studies of transmission, distribution, industrial systems, power generation, distributed generation and renewable integration. source
Automation
Tasks can be automated with Python, DIgSILENT Programming Language (DPL), a C++ API and a task automation tool for parallel execution. source
Core analyses
Its listed functions include load-flow, short-circuit, MV/LV network, contingency, protection, stability and electromagnetic transient analyses. source
Data exchange
The base package supports network-data import and conversion, and its DGS interface exchanges data in ASCII, XML, CSV and ODBC formats for GIS and SCADA interfacing. source
Downloads
The public download area offers product documents, while registered users can access current software releases, documentation and model libraries. source
Editions
Single-User uses a local SQLite database, Multi-User manages concurrent licences through a licence server, and Team Edition supports shared project data through Oracle, SQL Server or PostgreSQL. source
Founded
1985 source
Headquarters
Gomaringen, Germany source
Intended users
The maker describes the editions for individual end users, organisations managing multiple licences, and multi-user teams sharing central project data. source
Notable licence limits
A regular Softkey cannot be used in virtual environments; a cloud-based Softkey requires a permanent internet connection, and the optional floating licence on a local machine is limited to 30 days. source
Other interfaces
Dedicated interfaces include OPC DA/UA, IEEE C37.118 simulation and FMI 2.0-based third-party EMT/RMS co-simulation; some require separate licences, and OPC DA is slated for removal in PowerFactory 2027. source
Purpose
PowerFactory analyses electrical generation, transmission, distribution and industrial power systems. source
Security
DIgSILENT states that it is certified to ISO 27001:2022 and ISO 9001:2015. source
Support
Commercial perpetual licences include maintenance and support for the first 12 months, and subscriptions include them for the subscription term; software support requests go through the Customer Portal. source