Construction Scheduler 365 vs ConstructionOnline
Both are on the Construction Scheduling Software list. Here is what each maker publishes, side by side.
Construction Scheduler 365 | ConstructionOnline | |
|---|---|---|
| Place on the list | #15 5.9 | #1 8.2 |
| Maker | — | — |
| Starts at | £25 a month | $30 a month |
| Free | Free trial | Free plan |
| Runs on | Web | Android, API, iPhone/iPad, Mac, Web, Windows |
| Open source | No | No |
| Plans | Starter: £25 a month Pro: £49 a month Team: £89 a month | Core Tools: $0 ConstructionOnline Basics additional user: $30 a month OnPlan Scheduling add-on: $119 a month Redline Takeoff add-on: $150 a month |
| Verdict | Construction Scheduler 365 brings scheduling, inspection tracking, and billing into one web product for UK building firms. Check the active-job limits and plan support options against your team’s needs before choosing a plan. | ConstructionOnline brings estimating, scheduling, field records, and financial tools into one construction platform. Teams should check the quote-based pricing and the mobile app's connectivity and operating-system requirements before adopting it. |
| Visit Construction Scheduler 365 | Visit ConstructionOnline |
